    Do waterproofing needs to be done on the surface of the water, dig excellent permeability crystalline waterproofing, you can do it yourself on the cement surface with a super permeable waterproof guard (if there are cracks and potholes on the cement surface, fill the complete with metin porcelain glue and then do waterproofing).

    For the tile surface, first check whether the filling of the tile gap is complete (if the filling of the tile gap is incomplete, fill it with Meiding porcelain glue, and then use a stone tile waterproof guard to do waterproofing).

    Exterior wall paint can be made waterproof with transparent waterproof repair adhesive.

    The product will penetrate into the base layer and make the base layer waterproof. The product is recommended to be constructed in a dry place, the drier the base surface, the deeper the product can penetrate, if the base surface is full of moisture, high density, the material can not penetrate well. Regarding the principle of waterproof plugging, the source of water leakage is not blocked, and the water will only continue to penetrate into the wall, which will exist inside the wall for a long time, and will leak out from other parts of the wall when the water reaches a certain level.

    The problem cannot be solved, and only by spraying waterproofing agent on the outside of the roof or exterior wall so that the water cannot penetrate into the wall and flow away can the problem be completely solved.

  2. Anonymous users2024-01-23

    Invisible waterproofing technology can be used.

Related questions
6 answers2024-10-02

Friend, you can't solve the problem without smashing the floor tiles. Because your floor tiles are seeping water, it means that the waterproofing is not done well, and the anti-water should not be done well. In this case, the floor tiles must be smashed off, and then re-waterproofed, after the waterproofing is no problem, the re-paving bricks, the floor tiles must be done when the water is reversed. >>>More

1 answers2024-10-02

To do waterproofing, you need to do it on the frontal surface. >>>More

2 answers2024-10-02

The upstairs neighbor should pay full responsibility, first find the neighbor to negotiate a solution, if it doesn't work, and then find the property management, it is really not a legal way (it is generally impossible to get to this step).

4 answers2024-10-02

BATHROOM WATERPROOFING IS A VERY IMPORTANT PROCESS, THE HOUSE IN THE BUILDING HAS BEEN DONE BUILDING WATERPROOFING, THE WATERPROOF LAYER EXTENDS FROM THE GROUND TO THE WALL, 250MM HIGHER THAN THE GROUND ACCORDING TO THE CONVENTIONAL BATHROOM BY THE SHOWER HEAD WALL WATERPROOF LAYER HEIGHT SHALL NOT BE LESS THAN 1800MM, THE GENERAL THICKNESS SHALL NOT BE LESS THAN 1 5MM, AND THE WATERPROOF PROJECT MUST BE DONE AFTER THE END OF THE 24-HOUR WATER STORAGE EXPERIMENT. >>>More

4 answers2024-10-02

Then you have to get the tiles up, make them waterproof and then paste them, otherwise you can't do waterproofing. >>>More