How to deal with the insufficient ceiling height in the commercial area

Updated on Suspended ceilings 2024-09-01
1 answers
  1. Anonymous users2024-01-24

    Highly meet the requirements of the specification!! It is a must !! What is the current clear height?

    The main thing is that the bridge and equipment must be installed through the lower mouth of the beam, and it is necessary to ensure how much space they occupy. Parallel mounting reduces the build-up height. Control the boom and install it as close as possible under the board!

    If it doesn't work yet, the only way to modify the equipment is through the design unit!!

Related questions
1 answers2024-09-01

One is that the light position can be moved in the direction of the threading pipe. Only in this direction to change the position, you need to try to find the conduit, open the conduit and pull the conduit out. >>>More

1 answers2024-09-01

height meters, suspended ceilings have ceilings with very good ceilings.

5 answers2024-09-01

When there is no suspended ceiling, the bottom surface of the structural slab that looks up, and the bottom surface of the original rough concrete without any decoration is the ceiling. >>>More

2 answers2024-09-01

First, the ceiling should be designed with a "heavenly pool". >>>More