Can the bathroom be waterproof by doing this

Updated on Bathroom 2024-09-09
1 answers
  1. Anonymous users2024-01-24

    You've done a good job, and the original bathtub must have destroyed the original waterproofing layer of the wall or floor.

    Generally, if you do the test twice normally, there will be no problem if there is no water leakage, and if you do it four times, there will be no problem if the test does not leak and paste the tiles.

    If you're really worried, you can make a tarp (a green tarp material) again before tiling.

    During the test, after 24 hours of water release, go downstairs to see if there is a leak, if there is no leakage trace, there is no problem.

Related questions
3 answers2024-09-09

OK! And now in the home decoration, the bathroom floor must be waterproof. The shower walls are all painted with waterproof materials! The rest of the front is brushed 50-100cm high.

2 answers2024-09-09

Do waterproofing needs to be done on the surface of the water, dig excellent permeability crystalline waterproofing, you can do it yourself on the cement surface with a super permeable waterproof guard (if there are cracks and potholes on the cement surface, fill the complete with metin porcelain glue and then do waterproofing). >>>More

2 answers2024-09-09

No, the bathroom waterproofing needs to be done on the cement surface, and it is necessary to do a good job of waterproofing and then tiling. Now the market can be advertised on the floor tiles to do waterproofing, and the waterproof effect is still good are the gimmicks of business publicity, and there is basically no waterproof effect on the tiles. >>>More

6 answers2024-09-09

It should be possible! Now why 50% of the waterproof buildings are leaking, one of the points is not to pay attention to the protection of the finished product, even if your waterproof material is good, the construction quality is high, after the finished product protection is not in place, it still leaks. Therefore, during the construction of the waterproof layer and after the construction is completed, we must pay attention to the protection of the finished product, and the situation you said should be more responsible for the construction party.

2 answers2024-09-09

It is a human thing, how much will be unsatisfactory, and whether the water leaks in the later stage depends on your actual use and how to maintain it in the later stage.