Are stairwell and bathroom threading inspection batches done together or separately?

Updated on Bathroom 2024-09-12
1 answers
  1. Anonymous users2024-01-24

    It should be two lines, and the two lines are best to be inspected separately, and the stairwell can contain several more floors.

Related questions
3 answers2024-09-12

Each independent project is divided into inspection batches separately, and civil engineering (basic items such as walls, floors, ceilings, waterproofing), installation (various electrical), decoration (hardcover projects), heating and air conditioning in the cabinet and bathroom are reported separately with the heating and air-conditioning system of the whole room.

1 answers2024-09-12

The purpose of the inspection batch division is to facilitate the construction quality process management, construction quality behavior control and witness record of the project. The status of various projects is different, so the specifications should not be excessively rigid, but should be delineated in advance by the construction organization design of the project (approved by the superintendent), and adjustments are allowed during the matter.

2 answers2024-09-12

The stairwell was converted into a bathroom:

The layout of the stairwell can contribute to a mini bathroom, because there are no windows, the interior design of the bathroom is designed in a brighter white tone, and there are more such bathrooms downstairs, which adds a lot of convenience. >>>More

2 answers2024-09-12

It's a little crowded. Not so good.

5 answers2024-09-12

Make a 30 50 mm high water retaining strip (ridge) at the door of the bathroom with yellow clay, low-grade cement mortar and other materials, and block the floor drain tightly. Water is discharged from the ground to form a small pool with a depth of 20 to 30 mm. After 24 hours of water storage, no leakage is qualified.