How to divide the inspection batch between the bathroom and the balcony

Updated on Bathroom 2024-06-14
3 answers
  1. Anonymous users2024-01-24

    Each independent project is divided into inspection batches separately, and civil engineering (basic items such as walls, floors, ceilings, waterproofing), installation (various electrical), decoration (hardcover projects), heating and air conditioning in the cabinet and bathroom are reported separately with the heating and air-conditioning system of the whole room.

  2. Anonymous users2024-01-23

    The inspection batch of decoration is the same as that of civil engineering

    The safety floor is divided according to the construction section

    Bathrooms and stovetops are all part of the installation.

  3. Anonymous users2024-01-22

    I didn't understand, is it a dry and wet area, and the balcony is a washing machine area, right? Cover it with tiles and do a water seepage test before doing so.

Related questions
1 answers2024-06-14

The purpose of the inspection batch division is to facilitate the construction quality process management, construction quality behavior control and witness record of the project. The status of various projects is different, so the specifications should not be excessively rigid, but should be delineated in advance by the construction organization design of the project (approved by the superintendent), and adjustments are allowed during the matter.

7 answers2024-06-14

The common method of bathroom waterproof inspection is to do a closed water test after the waterproof layer is completely dry, and the main purpose of the closed water test is to check whether there is any leakage in the waterproof construction and whether the waterproof function is normal. >>>More

3 answers2024-06-14

Sanitary waterproof data is done with a water seepage test inspection lot, and the anti-mildew paint is good with water-based coating.

2 answers2024-06-14

However, the waterproof layer is coated with multiple layers, and if the construction is not paid attention to or there is no certain construction technology, it is easy to dry and crack, resulting in leakage. The waterproof layer must be carefully and meticulously, there can be no missing brush, the thickness of each brush can not exceed 1mm, and it must wait for the first brush to dry slightly (generally 1-2 hours) before the second brush, each time it must be so meticulous in place. After the waterproof layer is done, the inspection method is mainly through the closed water test, at least 24 hours in summer and 48 hours in winter, and the water test height is increased as much as possible. >>>More

3 answers2024-06-14

The innermost part is made into a shower area, the ideal width of the shower area is 90, and the outer one is the toilet.