What is the inspection batch for bathroom waterproofing?

Updated on Bathroom 2024-03-12
7 answers
  1. Anonymous users2024-01-23

    The common method of bathroom waterproof inspection is to do a closed water test after the waterproof layer is completely dry, and the main purpose of the closed water test is to check whether there is any leakage in the waterproof construction and whether the waterproof function is normal.

    The specific practice of the closed water test:

    1. After the waterproof construction is completed, the closed water test can be done after 24 hours;

    2. Temporarily block the floor drain and the perimeter of the pipeline mouth;

    3. Build a 20CM high retaining wall at the door;

    4. Start to store water, with a depth of 5-20 cm, and mark the water level;

    5. Water storage time 48 72 hours;

    6. After the water is closed on the first day, see if the water level has dropped significantly, if so, please check whether there is leakage around the roof and pipes downstairs in time, if not, continue to close the water;

    7. On the third day, the water is closed, and the downstairs ceiling and roof pipes are fully inspected.

    8. Carry out the next process after being fully qualified.

    The closed water test, also known as the water storage test, should be filled with water, and the water should have a sufficient volume. The water storage depth of the water storage test should not be less than 20mm, the water storage height is generally 30-100mm, the water storage time is 24 hours, and the water surface has no obvious drop to be qualified. This test is generally done on the roof, bathroom or room with waterproof requirements.

    In the early stage of the water storage test, it should be inspected downstairs every 1 hour, and every 2-3 hours in the later stage. If water leakage is found, the water storage test should be stopped immediately, the waterproof layer should be re-improved, and the water storage test should be carried out after the treatment is qualified.

  2. Anonymous users2024-01-22

    Toilet waterproofing is the quality acceptance record of the inspection batch of the coated waterproof layer. It belongs to roofing engineering.

    Name and number of construction execution standard Construction Quality Acceptance Code for Building Decoration Project GB50210-2001

  3. Anonymous users2024-01-21

    Do a closed water test, after the waterproofing is done, the irrigation water does not pass the waterproof layer, keep it for 48 hours, and observe the leakage of water. The leakage of the horizontal plane should not be less than 2mm

  4. Anonymous users2024-01-20

    The inspection batch form "Isolation Layer Inspection Batch Quality Acceptance Record Form" for waterproofing and isolation layer in the ground floor belongs to the ground sub-division of the building decoration and decoration division in the grassroots sub-project, which is located in the "leveling layer inspection batch quality acceptance record form" after the isolation, waterproof layer in the middle of the leveling layer and the surface layer. Generally, it is not felt that it is a real grassroots, so it is difficult to determine which sub-item it should belong to, and there is no separate item for the isolation layer in the unified standard for acceptance of construction quality of construction projects (GB50300-2001), so it can only be understood to the grassroots. And it is also a grassroots level.

  5. Anonymous users2024-01-19

    Look at your bathroom has a base layer, most of which are base layers, waterproof layers, and 2 inspection batches.

  6. Anonymous users2024-01-18

    Isolation layer engineering inspection batch quality acceptance record form.

  7. Anonymous users2024-01-17

    After doing a good job of waterproofing, wait for it to dry thoroughly before testing the waterDrain the water for a few more days. Go down below to see if there is any water leakage.

Related questions
3 answers2024-03-12

Toilet waterproofing practices:

Basic material selection: new waterproof materials such as cement mortar, old ones such as acrylic are commonly used toilet waterproof materials. We should choose based on the principles of easy construction, environmental protection and good quality. >>>More

2 answers2024-03-12

Before laying the bathroom floor, it needs to be waterproofed! There is a special waterproofing agent! After the treatment is dry, then release the water to test the waterproof effect, if there is immersion in the water, you need to do it again! Until you are satisfied!

5 answers2024-03-12

1. SBS modified asphalt waterproofing membrane: This membrane has good high temperature resistance, can be used in the temperature range of -25 to +100 degrees, has high elasticity and fatigue resistance, as well as up to 1500% elongation and strong puncture resistance and tear resistance. It is suitable for waterproofing projects in cold areas, as well as industrial and civil buildings with large deformation and vibration.

9 answers2024-03-12

Lin Jun waterproof coating has special waterproof coating for bathroom home decoration, K11 home decoration, JS polymer cement-based, polyurethane waterproof coating can be used for bathroom waterproofing, and the effect is not bad.

2 answers2024-03-12

Hello dear<>

The answer you are looking for: The characteristics of bathroom waterproofing are as follows: because of the characteristics of the high bathroom, the bathroom waterproofing also has its characteristics: first, the impact on the natural climate is not large, and the temperature change is small, so that the elongation of the waterproof material is not high; Second, the area is small, there are many yin and yang angles, and there are many channel outlets; Third, the adhesion performance of the wall waterproof layer and the ceramic tile should be good. >>>More