Can the kitchen waste pipe and the bathroom sewage pipe be connected together in the drainage engine

Updated on Kitchen 2024-09-10
4 answers
  1. Anonymous users2024-01-24

    Summary. The bathroom drain can be shared with the kitchen drain.

    It is normal to have only one toilet sewage pipe, only discharge the sewage produced by the bathroom, the general pipe diameter is at least above DE110, and the high-rise will use DE160, and the kitchen water can be set up separately according to the situation and can also be discharged into the toilet sewage riser, the rainwater pipe must be an independent riser, and the air conditioning water is currently required to be drained by an independent riser.

    At present, there is a submersible bend in general drainage, and the smell and dirt (even rats) in the sewage pipe cannot pass through the submersible bend to the ground.

    Can the kitchen waste pipe and the bathroom sewage pipe be connected together in the drainage engineering code?

    Bathroom floor drain can be with the kitchen floor drain old or share the bathroom sewage pipe only one is normal, only discharge the toilet sewage, the general pipe diameter is at least DE110 or above, high-rise will use DE160, kitchen water can be set up separately according to the situation can also be discharged into the bathroom sewage standpipe, rainwater pipe must be independent standpipe, air conditioning water is currently required to be independent standpipe service drainage. At present, there is a submersible bend in general drainage, and the smell and dirt (even rats) in the sewage pipe cannot pass through the submersible bend to the ground.

    No.

  2. Anonymous users2024-01-23

    No. In terms of acceptance, do you accept this in your family?

  3. Anonymous users2024-01-22

    No, I've never seen it on a drawing.

  4. Anonymous users2024-01-21

    I don't know if there is a new specification, it was possible before.

Related questions
3 answers2024-09-10

If it is a budget consideration, there are generally as follows: 1. The material, specification and quantity of water supply and drainage pipes; 2. Specifications and quantities of valves and angle valves; 3. The number of sanitary ware specifications; 4. The number of pipe supports; 5. If it is a concealed pipeline, the number of wall planing ditches and casing should also be considered; 6. Auxiliary materials for various pipeline assembly, etc. Hope it helps!

2 answers2024-09-10

This is called high-pressure grouting. Our company has this construction and material sales! >>>More

3 answers2024-09-10

Of course, you can, generally do another layer of waterproofing on it, and then close the water for 48 hours to see if there is leakage downstairs, and you can put tiles if there is no leakage.

1 answers2024-09-10

Acceptance Specifications for Ceiling Engineering Acceptance Specifications for Metal Ceiling Engineering This section is applicable to all kinds of metal plate (strip plate, square plate, grille) ceiling engineering. Number of inspections: Perception survey, 20% of the total number of deviation items are allowed to be randomly checked. >>>More