The developer didn t make the kitchen waterproof, so it s qualified

Updated on Kitchen 2024-08-20
3 answers
  1. Anonymous users2024-01-24

    Under normal circumstances, when the developer hands over the house, he only makes the bathroom waterproof, and the kitchen is generally not done.

    However, the kitchen also needs to be in constant contact with water in the future, so it is recommended to re-do waterproofing when decorating.

    The standard requirement for the kitchen to do waterproofing is that the floor needs to be all done, the wall is 30 cm high, and the waterproof area behind the vegetable sink is 50 cm above the water outlet.

    As for the material, it is recommended to use kitchen and bathroom waterproof slurry, and then follow the product instructions for construction.

  2. Anonymous users2024-01-23

    Unreasonable: Any developer must do waterproofing before handing over the house.

  3. Anonymous users2024-01-22

    The state only has toilets that are mandatory to do waterproofing, and for ourselves, we have to make waterproofing for kitchens and balconies.

Related questions
1 answers2024-08-20

Because the balcony leakage has affected the lives of the residents downstairs, this situation generally needs to be cooperated, but because it is caused by the developer's project quality defects, you can ask the developer to compensate for the loss, of course, all need to negotiate with the developer, property and interest groups before cooperating with the construction, and try to form a written document.

4 answers2024-08-20

Abstract Hello, dear, the developer of the new house kitchen must do waterproofing, before the developer delivers the house, it should have done the waterproofing of the bathroom and kitchen, and has done the "24-hour closed water test" and passed the inspection, so that the house can be said to be "the project inspection and qualified" in principle; to be able to collect the house. >>>More

1 answers2024-08-20

Most of them only do waterproofing of kitchens and bathrooms, so they are really doing waterproofing again when they are decorating themselves.

5 answers2024-08-20

When handing over the house, it should be waterproof. Otherwise, it violates the rules during acceptance.

3 answers2024-08-20

Before the developer hands over the house, the bathroom and kitchen waterproofing of the house need to be done by the developer before the house can be delivered. >>>More