Renovated bathroom waterproof

Updated on Bathroom 2024-08-24
3 answers
  1. Anonymous users2024-01-24

    It's that the bathroom has tiles, and I want to make a waterproof layer.

    Then you can use Qinglong No. 3 waterproof paint.

    It is dedicated to the bathroom tiles, no need to smash the tiles.

    It is a transparent and environmentally friendly waterproof coating.

  2. Anonymous users2024-01-23

    The bathroom is waterproof, and the surrounding walls need to be painted at a height of not less than 30 cm; If there is a shower, the height of the waterproof paint applied on the installation of the shower faucet and the adjacent wall should not be less than 150 cm, preferably about 180 cm.

    After the waterproofing is done, a closed water test should be done. It is to put the water on the floor of the bathroom, so that the ground is completely submerged in water about 3 4 cm, and set a fixed elevation (horizontal plane); After 24 hours, if the water level is below the set elevation, it means that there is a water seepage problem on the ground, that is, the waterproofing is not done well. In this way, it is necessary to re-do the waterproofing.

    If it's convenient, you can also go downstairs to the bathroom to check for water imprints.

    Waterproofing should be carried out before paving floor tiles and wall tiles, and waterproofing cannot be done after paving.

  3. Anonymous users2024-01-22

    To clean up, first brush a layer of water-proof water, and then brush a layer of polyurethane.

Related questions
8 answers2024-08-24

There will be water baptism in the bathroom every day, so it is the key to do a good job of waterproofing measures when decorating, so as to avoid water flowing into the wall and eroding the wall.

2 answers2024-08-24

Step 1: Grassroots treatment and cleanup.

Before doing waterproofing, observe the water circuit of the bathroom and transform it in combination with the actual situation, so as to have a detailed understanding of the concealed project. After the plan is determined, the water, electricity and heating pipes are laid and chiseled. Secondly, the original decoration materials are cleaned, and then several sides are paved with cement slurry, and then waterproofed. >>>More

11 answers2024-08-24

How is your progress now, I am specialized in decoration and maintenance, this depends on your luck, you don't look at these water, it may be a big hidden danger, I have encountered this problem, but the water downstairs is a little seepage, I dug the bathroom and repaired it can not receive the final payment, and I also tried the developer's waterproof is qualified. >>>More

2 answers2024-08-24

The bathroom should be waterproofed with asphalt white oil for the second time, and a closed water test should be done after it is done. This must be done, lest there will be problems in the future, and the people downstairs will report trouble. The kitchen generally does not need to be done, but the wall can be waterproof with JS composite waterproof coating, acrylic advanced elastic waterproof coating, one-component moisture-curing pure polyurethane waterproof coating, HG203 water-curing sealing waterproof material and so on.

2 answers2024-08-24

Now developers will normally do a layer of waterproofing in the bathroom, and they can do a layer of waterproofing themselves. However, it is safer for you to make two layers of waterproofing yourself, and then it is a normal brick.