After the decoration project, the window frame is installed after the bathroom window, how to wipe t

Updated on Bathroom 2024-08-18
1 answers
  1. Anonymous users2024-01-24

    The window can be customized, and then let the amount of doors and windows be made after the window is smoothed, and the window sill stone is the last paste

Related questions
4 answers2024-08-18

The pressure should be tested first and then closed, so that the loopholes can be repaired in time after the pressure test, so as to avoid the repeated operation of sealing first and then testing the pressure, and then opening the seal when there is a problem.

6 answers2024-08-18

Install the pipe first, and then do the waterproofing.

Good luck. >>>More

1 answers2024-08-18

The bathroom is made of 100mm thick aerated concrete blocks, the corners of the walls have a certain height of concrete guide walls or solid walls, along the height @500 should be set up 2 6 tie bar masonry, when the height of the masonry is more than 4 meters, the wall should be set up at half a height of reinforced concrete horizontal through the tie beam (belt). See GB50011-2010 Code for Seismic Design of Buildings. >>>More

3 answers2024-08-18

Raise the bathroom so that you don't touch the existing floor, and then connect the pipes into the main sewer pipes yourself. There should be a certain inclination. And there must be a water storage elbow to prevent odor. >>>More

3 answers2024-08-18

Make the floor first, then put the toilet bowl and seal it with silicone. >>>More