Regarding the decoration and decoration works, modify the toilet sewer pipes. The bathroom wanted to

Updated on Bathroom 2024-07-31
3 answers
  1. Anonymous users2024-01-24

    Raise the bathroom so that you don't touch the existing floor, and then connect the pipes into the main sewer pipes yourself. There should be a certain inclination. And there must be a water storage elbow to prevent odor.

    What are you doing smashing the floor,,, responsibility is of course yours. Can't because his floor slab is not thick enough, so you can just smash it,,, affect the structural strength of his entire floor, ah,,, I'm dizzy. When something happens, I'll look for you.

    In addition to not affecting the structure, you can't also affect the neighbors. For example, you can only dig half of the shared wall, and the other half is next door. For example, if your pottery wall breaks someone else's water pipe, you must repair it, these are all common sense,。。

  2. Anonymous users2024-01-23

    How did you do that? Are you looking for a private person to do it? Don't you know anything about the process?

  3. Anonymous users2024-01-22

    Raise the ground level and bury the pipe inside.

Related questions
4 answers2024-07-31

Original, ingenious transformation. It is advisable to inform the property and also take care not to damage the waterproofing layer of the roof. >>>More

1 answers2024-07-31

The bathroom is made of 100mm thick aerated concrete blocks, the corners of the walls have a certain height of concrete guide walls or solid walls, along the height @500 should be set up 2 6 tie bar masonry, when the height of the masonry is more than 4 meters, the wall should be set up at half a height of reinforced concrete horizontal through the tie beam (belt). See GB50011-2010 Code for Seismic Design of Buildings. >>>More

1 answers2024-07-31

You're talking about the thick sewer pipe, right? The decoration is wrapped with bricks by bricklayers, referred to as guarantee. The cost is between 150-300, and the cost varies depending on the region. The guarantee generally requires 40 red bricks. >>>More

4 answers2024-07-31

Wrap the sewer pipe with mineral wool.

2 answers2024-07-31

It is feasible from the diagram, but the specific construction from the riser to open three passes, the construction still needs to find an experienced master, it is recommended that you raise 15 cm from the supervisor to the new toilet together, so that the construction is more convenient, not easy to leak, and it is not easy to block when used in the future, please accept it.