How to waterproof the toilets and galleys on board

Updated on Bathroom 2024-08-20
1 answers
  1. Anonymous users2024-01-24

    Toilet waterproofing practices:

    1.The wall is made of mortar waterproofing agent, which is convenient for tiling and not hollow. The first layer of brushed plain mortar with a thickness of 2 mm, and the second layer of mortar waterproof layer with a thickness of 8 mm.

    2.The ground is constructed with K11 waterproof slurry, which is very good for the construction of the periphery of the pipeline and the yin and yang corners. Brush directly 2 times with a thickness of 1 mm.

    The waterproof height of the wall should be at least one meter high, and it is recommended to do the full height if possible, and if it is close to the bedroom, it is recommended to do the full height by the wall of the bedroom.

    The kitchen waterproofing manufacturing method:

    The waterproof layer of the kitchen, the ground is all waterproof, the wall is more than 30 cm high, and the waterproof of the water is involved, such as the waterproof of the dishwasher.

Related questions
9 answers2024-08-20

1. Waterproof construction technology, process and precautions for kitchen and bathroom. >>>More

4 answers2024-08-20

Common floor heating is divided into electric heating and plumbing, under normal circumstances, if it is electric heating, the bathroom can first do a waterproof in the backfill pit, and then backfill leveling and install electric heating, and then do a waterproof on the electric heating, a total of 2 times, the kitchen can be done on the leveled ground first, and then do it once on the floor heating, a total of twice. If it is plumbing, then the kitchen is the same, and the bathroom is recommended to do it three times, namely in the backfill pit, after the backfill leveling, and after the installation of floor heating. For materials, it is recommended to use mortar waterproofing agent, because of high strength, puncture resistance and high temperature resistance, so that the protection period can be longer.

12 answers2024-08-20

Sanitary home waterproof 3 times, it is recommended that the bedroom wall between the brush to the top, the rest of the part is higher than the meter. This is both waterproof and moisture-proof. If there is no floor drain in the kitchen, you can not brush it, and if there is a floor drain, you can brush it to more than 30 cm, because it is still a dry area. >>>More

10 answers2024-08-20

The basic principle is that the place where the water for national defense is counted, and the wall must also be counted. >>>More

2 answers2024-08-20

The kitchen and bathroom are commonly used in the home, and there are more water sources, so be sure to take waterproof measures. After the renovation of the bathroom is completed, all the drains of the bathroom are blocked, and a 25 cm high "barrier" is built at the door, and then 20 cm high water is poured into the bathroom. After 24 hours, you will check whether there is leakage on the surrounding walls and floors, this 24-hour waterproof experiment is the key to ensure the quality of the waterproof project in the bathroom, you must do it.