    First buy a cold brush to plug the leakage, pay special attention to the gap between the sewer pipe and the building, and then brush the Oriental Yuhong waterproof 2-3 times, brush evenly when brushing, after the brush is dry, do a closed water test, the first to see if the water surface has fallen, the second go downstairs to see if there is a leakage. After doing the waterproofing should be paved with tiles is the best, otherwise the waterproof surface will be destroyed for a long time, once destroyed, all the waterproofing must be redone, this process Beijing market charges about 75 yuan per square meter. If you do it yourself, each barrel is waterproof about 260 yuan, dozens of plugging spirits, because the general waterproof warranty period is generally about 5 years, so the price is higher.

  2. Anonymous users2024-01-23

    In the past, waterproof glue was used, but now polymer cloth is basically used, and the cost is not high, about 40 yuan per square meter, and the bathroom itself has generally been waterproofed, plus this is enough. The floor tile is directly tiled and the bricklayer is done, and the manual collection is basically about 100 yuan. (within 5 square meters) works very well.

  3. Anonymous users2024-01-22

    The floor is leveled first, and then Henkel Medeland flexible two-component is used twice. THE WALL SURFACE IS 1800MM. It's OK (as long as you don't mess around with nails).

  4. Anonymous users2024-01-21

    Personally, I think it's best to find a special waterproof project, only to do the toilet will not be too expensive, after buying the materials to find workers to do waterproofing, if the water really leaks downstairs in the future, there will be a lot of trouble, and if the workers they are looking for if there is really a problem can not find anyone, people will not admit that it is their own fault, find a waterproof can sign a contract, ask for a guarantee of a few years or something, a peace of mind.

Related questions
3 answers2024-08-29

Waterproof construction process:

Base treatment: Paste the elevation contour line with masking paper, apply the first emulsion, apply the second emulsion after drying, dry, and close water test. >>>More

4 answers2024-08-29

If the two walls mentioned by the landlord are gypsum board, I suggest that the partition be re-made after demolition, and the gypsum board will not last too long even if it is waterproof, so it is better to improve. >>>More

2 answers2024-08-29

Bathroom waterproofing, generally we will directly recommend the use of mortar waterproofing agent, not only with the base surface sticky firm, but also high puncture resistance can be with the same life as the building, the use of the method. >>>More

1 answers2024-08-29

1.Before the kitchen is renovated, it is necessary to carefully check whether there is any leakage in the kitchen on the upper floor, and if there is, you should let the waterproofing project upstairs be done before decorating. >>>More

1 answers2024-08-29

Waterproof construction process: