Is it necessary to decorate the kitchen and bathroom first or buy a handbasin or something in advanc

Updated on Kitchen 2024-08-27
4 answers
  1. Anonymous users2024-01-24

    The drawings should already have the size distribution of kitchen utensils (cabinets, sinks, etc.), and the bathroom is also A, so just buy things according to this size, so you can buy earth and stone bricks first, and then buy other things according to the drawings.

    Our house was renovated in August last year, so I know.

  2. Anonymous users2024-01-23

    First determine the size and general placement of wash basins, washing machines, toilets, mirror lamps, etc., so as to arrange the location and direction of the upper and lower water pipes and circuits, and do not need to be too precise, almost on the line, and buy it after decoration.

  3. Anonymous users2024-01-22

    In order to install it accurately in the later stage, and at the same time have a place to store it, it is best to buy it back first.

  4. Anonymous users2024-01-21

    The home improvement company will help you get it right.

Related questions
16 answers2024-08-27

Generally speaking, it is to put the bricks first and then open the door, unless you have some other advanced needs

1 answers2024-08-27

This must be the first to lay the floor tiles, and then the toilet to install; >>>More

2 answers2024-08-27

The decoration of the bathroom is like this, if it is a hard package of exhaust and drainage pipes, first wrap the pipes, and then pave the ground with sand and cement mixture, do membrane waterproofing on top, after the water seepage experiment, start to measure the vertical horizontal line to pave the wall tiles, and pave the floor tiles. The bricklayer is finished, and the carpentry works are carried out on the ceiling. Only in this order.

6 answers2024-08-27

The ceiling of the kitchen and bathroom, including gypsum board, must be tiled and then suspended, otherwise the joint will definitely not be effective. >>>More

5 answers2024-08-27

After the bathroom is tiled, the door should be installed first, and then the ceiling, otherwise the ceiling will be installed first, which may cause damage to the ceiling when making the door.