Bathroom decoration is the first to hang the ceiling, or to install the door first

Updated on Bathroom 2024-06-23
5 answers
  1. Anonymous users2024-01-24

    After the bathroom is tiled, the door should be installed first, and then the ceiling, otherwise the ceiling will be installed first, which may cause damage to the ceiling when making the door.

  2. Anonymous users2024-01-23

    1. The order of all bathroom decoration is to install the ceiling first and then the door, because if you install the door first, it is inevitable that the ceiling will not bump into the door when installing the ceiling.

  3. Anonymous users2024-01-22

    It is to install the door first and then install the ceiling, otherwise the ceiling will be damaged when the door is made.

  4. Anonymous users2024-01-21

    It must be the door, my house has just been renovated.

  5. Anonymous users2024-01-20

    The order of bathroom decoration is to install the ceiling first and then the door.

    The bathroom ceiling is generally 20 cm away from the original roof.

    The ceiling has the functions of heat preservation, heat insulation, sound insulation and sound absorption, and is also a hidden layer for electrical, ventilation and air conditioning, communication and fire prevention, alarm pipeline equipment and other projects.

    Home improvement ceiling is a common link in home improvement. Suspended ceilings are classified differently according to the material of the decorative panel. Ceiling decoration materials are the main basis for distinguishing the name of the ceiling.

    Working conditions: During structural construction, 6 10 steel bar booms should be embedded in the joints of cast-in-place concrete floor slabs or precast concrete floor slabs according to the design requirements, and the general spacing is 900mm and 1200mm.

    When the wall and column of the ceiling room are brick masonry, the anti-corrosion wooden bricks should be embedded according to the ceiling elevation during masonry, and the wooden bricks should be buried along the wall spacing 900mm 1200mm, and more than two wooden bricks should be buried on each side of the column.

    After installing various pipelines and equipment in the ceiling, determine the location of lamp positions, vents and various exposed orifices.

    All kinds of materials are ready.

    Before the installation of the roof cover panel, the wall and floor wet operation project should be completed.

    Set up the roof construction operation scaffold.

    Before the large-scale construction of the light steel skeleton roof, the model room should be made, and the camber, lamp trough, vent and other places of the ceiling should be constructed.

Related questions
16 answers2024-06-23

Generally speaking, it is to put the bricks first and then open the door, unless you have some other advanced needs

4 answers2024-06-23

If the smoke pipe is buried in the ceiling, the smoke pipe should be embedded before the ceiling, and the ceiling and the cabinet do not conflict, but the most comfortable order is: embedded smoke pipe - ceiling - cabinet - smoke machine stove! It's okay to hang the ceiling first, and it's very convenient to dismantle the ceiling!

2 answers2024-06-23

The decoration of the bathroom is like this, if it is a hard package of exhaust and drainage pipes, first wrap the pipes, and then pave the ground with sand and cement mixture, do membrane waterproofing on top, after the water seepage experiment, start to measure the vertical horizontal line to pave the wall tiles, and pave the floor tiles. The bricklayer is finished, and the carpentry works are carried out on the ceiling. Only in this order.

6 answers2024-06-23

The ceiling of the kitchen and bathroom, including gypsum board, must be tiled and then suspended, otherwise the joint will definitely not be effective. >>>More

1 answers2024-06-23

It is better to install the floor first, the floor has a baseboard or something, if you install the door first, it is difficult to grasp the size of the floor, which will lead to the running of the floor tiles at least twice.