How to make the bathroom waterproof thoroughly

Updated on Bathroom 2024-08-07
1 answers
  1. Anonymous users2024-01-24

    First: the ground needs to be leveled first.

    Second: Brush horizontally and vertically with waterproof paint (not polypropylene) about two kilograms per square meter Third: Seven days after brushing, do a closed water test.

    Fourth: do not leak after the tile is pasted with adhesive.

    Fifth: After the tile is dry, fill the caulk with a beauty grout.

Related questions
1 answers2024-08-07

The key to this waterproofing is to control the concrete pouring of the house structure, and the waterproof layer in the later stage can only play the role of impermeability.

2 answers2024-08-07

The waterproofing of the bathroom is done twiceBackfill once before (done after pipe modification). The main purpose is to prevent the pipe from rupturing and generating a large amount of water seepage. The waterproofing after backfilling is carried out after the water and electricity are completed (before tiling). The main purpose is to prevent water from leaking down, and also to prevent moisture from eroding the wall and causing mold. >>>More

3 answers2024-08-07

Toilet waterproof construction process standard.

First, the process flow. >>>More

2 answers2024-08-07

Generally speaking, the bathroom is the most prone to water seepage, and the leakage place is the position on the side of the sewage pipe, so the first step is to clean the position of the pipe edge. Then pour out a hump shape with cement sand at the edge of the pipe, and then level the entire bathroom sink down the hump shape until it dries. >>>More

5 answers2024-08-07

Bathroom waterproofing practices What is it, how to do the bathroom waterproofing, how to do the bathroom waterproofing, these issues are more concerned about the owners. Tuba Rabbit will solve your doubts and introduce the practice of bathroom waterproofing. >>>More