When the kitchen is renovated, whether to put tiles or hang the kitchen first

Updated on Kitchen 2024-08-27
1 answers
  1. Anonymous users2024-01-24

    It is to paste the tiles first and then hit the wall cabinet, because the wall cabinet may change in the future, and the tile generally does not change.

Related questions
2 answers2024-08-27

Generally, kitchen cabinet companies will recommend that you choose kitchen appliances of what size, and then install electrical appliances after the kitchen cabinet installation is completed (if possible, the electrical appliances are installed on the same day, the cabinet is installed in the morning, and the electrical appliances are installed in the afternoon before the cabinet installer is gone), and they can solve the problem together if they find the best!!

1 answers2024-08-27

Generally speaking, the cabinets are set first, and then the tiles are paved. >>>More

3 answers2024-08-27

Paste the brick first, and then the ceiling, so that the ceiling can cover the upper edge of the wall tiles and make the appearance look good.

2 answers2024-08-27

The wall cabinet should be done first and then installed to avoid collision. Smoothly.

1 answers2024-08-27

1. If your ceiling is not directly fixed on the top of the cabinet, then the normal order is basically to do the ceiling first, and the smoke exhaust pipe of the range hood can be placed on the top surface in advance, and then wait until the cabinet is installed and then install the range hood. >>>More