The floor tiles in the living room, kitchen and bathroom are laid first

Updated on Living room 2024-08-17
2 answers
  1. Anonymous users2024-01-24

    Generally, the bricks of the kitchen and bathroom should be lower than that of the living room, because the kitchen and bathroom have water1

  2. Anonymous users2024-01-23

    Laying the kitchen and bathroom first is a normal engineering process.

Related questions
1 answers2024-08-17

Depending on what project progress you have reached now, for example, your bathroom door has been installed, and the living room and kitchen and bathroom can be carried out together, if the kitchen and bathroom door is not installed, you can only do the living room, because the door is not installed and your ceiling is not sure how to hang.

2 answers2024-08-17

Generally, it will not affect the opening and closing of the door, because nearly 1CM is reserved when the carpenter measures and installs the door. The joints of the floor and floor tiles should be edge-sealed, otherwise they will not be beautiful and moisture-proof. If you want to sand, even if you smooth out the seams, there is still no way to make the two sides seamless.

3 answers2024-08-17

The center position is still replaced, so as not to match the same color bricks in the future, the corners or places where the furniture is placed can be mended with marble glue, or ceramic glue, it doesn't matter if you polish it.

2 answers2024-08-17

Jubilant, one is the design is simple and elegant, the second is the material is good, the third is the price is cost-effective, the fourth is durable, and the house is ready to install him!

4 answers2024-08-17

1. The floor tiles are generally constructed by dry paste method, and are directly paved on the original ground, and there is no need for additional leveling, so there is no problem of one-time leveling. Moreover, even if the thickness of the floor tiles is comparable to that of the floor, when the floor tiles are paved, cement slurry is still needed, and there will be a few millimeters of error between the thickness and the composite floor; Even if there is a moisture-proof film under the floor, the thickness of the film cannot catch up with the thickness of the cement slurry. Therefore, the leveling is carried out separately. >>>More