The home is renovated in 90 square meters, with the exception of two bedrooms with all other tiles,

Updated on Kitchen 2024-08-16
5 answers
  1. Anonymous users2024-01-24

    Well, I have to ask the contractor about this, I said that one day, then I must not exhaust those two bricklayers to death!

  2. Anonymous users2024-01-23

    Thirty days at the earliest. Two people,

  3. Anonymous users2024-01-22

    If both bricklayers are masters, it will take about eight days.

  4. Anonymous users2024-01-21

    It should be about 5 days, and my balcony 14 square did more than two days!

  5. Anonymous users2024-01-20

    There is no preparation of materials, excluding the preparation of materials can be completed in three or four days

Related questions
4 answers2024-08-16

Buy Gree's, a 3P cabinet machine, 2 hang-ups. You should consider the wiring situation of your building, that is, whether the wires can hold 10 to 15A of electricity, if the wire diameter of the air conditioning socket is less than 4 square millimeters, then you should choose a 2P cabinet. If you can choose a bigger one, you can choose a bigger one, so as to save electricity. >>>More

2 answers2024-08-16

It must be a good decoration in the room, and the sleeping place is more important.

1 answers2024-08-16

If it is a self-built house without a public pool, it can be designed as 3 realities, 1 living room and two bathrooms. I hope my answer can help you.

1 answers2024-08-16

It depends on the degree of complexity and the number of people, and if there are three people, it is not too complicated for two days.

4 answers2024-08-16

Bathroom square meters, kitchen: square meters, one row side by side, one bedroom 8 square meters, one bedroom 6 square meters, what is the structure of the house? Or if you send a picture, I am 38 square meters, two bedrooms designed by myself, a kitchen and a bathroom, the bedroom is quite large, look at your small house structure for you to plan!