Well, I have to ask the contractor about this, I said that one day, then I must not exhaust those two bricklayers to death!
-
Thirty days at the earliest. Two people,
-
If both bricklayers are masters, it will take about eight days.
-
It should be about 5 days, and my balcony 14 square did more than two days!
-
There is no preparation of materials, excluding the preparation of materials can be completed in three or four days
Buy Gree's, a 3P cabinet machine, 2 hang-ups. You should consider the wiring situation of your building, that is, whether the wires can hold 10 to 15A of electricity, if the wire diameter of the air conditioning socket is less than 4 square millimeters, then you should choose a 2P cabinet. If you can choose a bigger one, you can choose a bigger one, so as to save electricity. >>>More
It must be a good decoration in the room, and the sleeping place is more important.
If it is a self-built house without a public pool, it can be designed as 3 realities, 1 living room and two bathrooms. I hope my answer can help you.
It depends on the degree of complexity and the number of people, and if there are three people, it is not too complicated for two days.
Bathroom square meters, kitchen: square meters, one row side by side, one bedroom 8 square meters, one bedroom 6 square meters, what is the structure of the house? Or if you send a picture, I am 38 square meters, two bedrooms designed by myself, a kitchen and a bathroom, the bedroom is quite large, look at your small house structure for you to plan!