What is the matter with the toilet that can t hold water without leaking after it is waterproof

Updated on Bathroom 2024-08-20
4 answers
  1. Anonymous users2024-01-24

    I don't know if you described that you can't store water when you do the closed water test, but there is no leakage, the most common reason is that the floor drain is not closed well when doing the closed water test, resulting in water loss and water level drop. The following is the standard practice for closed water testing, you can refer to the comparison:

    1. After the waterproof construction is completed, you can do the closed water test after the waterproof layer is completely dry;

    2. Temporarily block the floor drain and the perimeter of the pipeline mouth;

    3. Build a 20CM high retaining wall at the door;

    4. Start to store water, with a depth of 5-20 cm, and mark the water level;

    5. Water storage time 48 72 hours;

    6. After the water is closed on the first day, see if the water level has dropped significantly, if so, please check whether there is leakage around the roof and pipes downstairs in time, if not, continue to close the water;

    7. On the third day, the water is closed, and the downstairs ceiling and roof pipes are fully inspected.

    8. Carry out the next process after being fully qualified.

  2. Anonymous users2024-01-23

    Wait until the waterproof layer is completely dry before you can do a closed water test;

    2. Temporarily block the floor drain and the perimeter of the pipeline mouth;

    3. Build a 20CM high retaining wall at the door;

    4. Start to store water, with a depth of 5-20 cm, and mark the water level;

    5. Water storage time 48 72 hours;

    6. After the water is closed on the first day, see if the water level has dropped significantly, if so, please check whether there is leakage around the roof and pipes downstairs in time, if not, continue to close the water;

  3. Anonymous users2024-01-22

    Although it is called waterproof, it is mainly platoon-based.

  4. Anonymous users2024-01-21

    It may be that the waterproofing is not done well, and you can use the digyou black gold steel waterproof guard to do waterproofing.

Related questions
2 answers2024-08-20

The closed water test was fine, but the renovation was completed but there was a water leak - this situation is very common. Then the reasons for this may be the following: >>>More

1 answers2024-08-20

Is it just living in it and not leaking, the floor drain is blocked, if this is the case, ask the property.

1 answers2024-08-20

I suggest that you still make sure that the waterproof layer is done well, so as to ensure that there will be no water leakage.

1 answers2024-08-20

Hello! The waterproofing construction of caisson toilet is as follows: Step 1: >>>More

2 answers2024-08-20

Look at your waterproof budget, basically you don't need to do waterproofing after doing the closed water test, if you are afraid of a long interval and unreliable waterproofing, you can put the closed water test before tiling, reducing the time between the two processes is also a way.