The bathroom has been brushed three times with waterproof materials, can I not do a waterproof test?

Updated on Bathroom 2024-08-21
2 answers
  1. Anonymous users2024-01-24

    It is recommended to do a waterproof experiment first.

    The purpose of the waterproof experiment is to check the quality of waterproofing, whether the waterproofing is in place, and whether there are dead ends. If there is a problem, deal with it in time.

    After the decoration is completed, if there is water seepage and water leakage, it is more difficult to maintain, the construction is difficult, and the maintenance cost is high.

  2. Anonymous users2024-01-23

    Qinglong experts often say that the waterproof layer is made, and the water will be tested in a few days. I don't know if there's a problem if I don't test the water.

    However, when painting, the first time must be dry, and then the second time, the third time is the same, and the second time is dry.

    The bathrooms are made of environmentally friendly waterproof paint. For example, Qinglong's HG203 environmentally friendly waterproof coating is more popular.

Related questions
5 answers2024-08-21

It is estimated that you are using JS waterproof paint or waterproof mortar, the reason is that the ratio of emulsion and powder is not right, and the emulsion is used less. The second is that the quality of the acrylic emulsion is not good.

3 answers2024-08-21

Normal construction painting two to three times is sufficient, has met the process requirements; Of course, there is a surplus of materials, and it is okay to brush it a few more times, but the cost of labor and materials (excess can be ignored) has increased a lot. >>>More

2 answers2024-08-21

After painting, it is applied on the premise that the waterproof layer of the previous painting is not sticky, and the two brushes before and after are crossed. This can be done to make each layer of waterproof layer formed a solid overall waterproof layer with a solid bond to the base surface.

2 answers2024-08-21

Contractors do not package materials, this depends on the height of the floor, the height of boiling asphalt transportation, generally about 12 square meters.

2 answers2024-08-21

I don't know if he understands what he said upstairs, silicone can not be soaked in water for a long time, plus non-woven polypropylene cloth is two oil and one cloth is commonly used in the protective layer can not be used as a protective layer to prevent cracking. It is recommended to make the best water-resistant polyurethane coating on the bathroom floor for a long time, and it is difficult to hang the side wall if it is made of polyurethane cement, and the side wall does not need to be soaked in water for a long time, and it is recommended to do JS polymer cement coating with a ratio of 3:1 that can directly stick to the bricks. Hope to adopt.