Normal construction painting two to three times is sufficient, has met the process requirements; Of course, there is a surplus of materials, and it is okay to brush it a few more times, but the cost of labor and materials (excess can be ignored) has increased a lot.
It is advisable to leave the remaining waterproofing paint for a period of time so that it can be used to repair any remaining problems.
-
I don't care about the thickness of the water, I know that the waterproof material is good, the technology is good, and the water does not leak after trying.
-
Three times will do. If you have it, it's better to brush it again.
It is estimated that you are using JS waterproof paint or waterproof mortar, the reason is that the ratio of emulsion and powder is not right, and the emulsion is used less. The second is that the quality of the acrylic emulsion is not good.
Not feasible, it needs to be painted twice.
Bathroom waterproofing process: >>>More
Two coatings for waterproofing toilets.
Nowadays, the materials used for waterproofing are generally paints, and asphalt-based waterproofing coatings are basically not used. Here are two coatings commonly used for waterproofing in the bathroom. >>>More
Waterproofing should be brushed with waterproof paint first. >>>More
It's still volatile.