I just took over the new house, and now I am doing the renovation, I want to ask if it is to do the

Updated on Bathroom 2024-08-31
5 answers
  1. Anonymous users2024-01-24

    Of course, it doesn't matter if you do it on the balcony or not, the bathroom must be done, but not before the decoration, but in the middle of the decoration, and let the bricklayer do it before the tiles.

  2. Anonymous users2024-01-23

    I don't do engineering for others, but I can provide free professional technical advice on concrete waterproofing and leakage repair! Repair today, leak tomorrow, repair every year, leak every year!

  3. Anonymous users2024-01-22

    The toilet must be waterproofed The masonry must first do a good job of waterproofing the settling bucket, and then the embedded pipe, and then the settling bucket can be filled

  4. Anonymous users2024-01-21

    It has to be done. And it has to be done very seriously.

  5. Anonymous users2024-01-20

    Yes, many living room floor arches are caused by water leaks in bathrooms and balconies.

Related questions
21 answers2024-08-31

If it is the love of family affection, there should be no reason for her to resist it. But it's best not to do this, because it will disturb your stepmother cooking! >>>More

2 answers2024-08-31

Oh, this should be easy to change, look at the picture

2 answers2024-08-31

I've done it, veterans bully new recruits, the old rules.

2 answers2024-08-31

The layout is very good and doesn't require major changes. >>>More

3 answers2024-08-31

It doesn't matter what kind of suspended ceiling you are. All start from a point (that is, the starting edge. wall) is the size of the plate. If the size is not enough, I put the joint on the edge point as possible. Although placed in the middle of the room.