After testing the water in the bathroom, use quick drying cement Degao No. 1 to fill part of the l

Updated on Bathroom 2024-08-17
1 answers
  1. Anonymous users2024-01-24

    The significance of testing the water is to find the defects of the waterproof layer that cannot be found by the naked eye, and if it is found to be leaking, it is feasible to re-construct the waterproof layer.

Related questions
3 answers2024-08-17

Wait until the waterproof layer is all dry, generally 24 hours, depending on the temperature at that time!

1 answers2024-08-17

The reasons for this situation: 1. The base layer of the waterproof material is too wet. 2. No ventilation. It should be kept ventilated now, and this will not be the case. Gulan Waterproof provides technical consultation and construction services for waterproof leakage repair and plugging!

2 answers2024-08-17

Improper proportions, up to 1:3

1 answers2024-08-17

If the bathroom waterproof test has been carried out for more than 1 week, it will not affect the waterproof quality. The material used for waterproofing is waterproof and not afraid of blisters. Only by testing the water for a long time can we really pick up the leak and be more assured.

2 answers2024-08-17

After the bathroom waterproofing is done, you can do a 48-hour water holding experiment, and you can lay bricks only after there is no problem. It must be waterproof and dry before doing the water holding experiment!