After the toilet did the waterproof and closed water experiment, after the water was discharged, it

Updated on Toilets 2024-08-20
1 answers
  1. Anonymous users2024-01-24

    After doing the waterproofing, it is caused by testing the water without drying it thoroughly, and in such a situation, it is best to do the waterproofing again.

Related questions
1 answers2024-08-20

Dig the best permeable waterproofing can be done by yourself. >>>More

2 answers2024-08-20

1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More

1 answers2024-08-20

The leakage after the construction of the waterproof layer is generally caused by two reasons: one is that the waterproof layer is not protected when the next step of construction is carried out after the construction of the waterproof layer is completed, resulting in the damage of the waterproof layer, thereby losing the waterproof effect. At the second time, the water closure time is more after the construction of the waterproof layer is completed, and the standard is 72 hours. At.

2 answers2024-08-20

Water after the water is closed! Solution:

1. Shake out the water utensils. >>>More

6 answers2024-08-20

If you don't do a closed water test after doing waterproofing, then you can do a closed water test after pasting tiles. However, it is necessary to wait until the tile grout is completely dry, and to extend the closed water time appropriately, because the tile itself has a certain water barrier, so the extended time can make the results of the closed water test more accurate. >>>More