After the bathroom is waterproofed, do I need to do anything before the mortar leveling?

Updated on Bathroom 2024-08-30
5 answers
  1. Anonymous users2024-01-24

    Spread the cement mortar directly on top of the waterproof layer.

  2. Anonymous users2024-01-23

    After the waterproof layer is decorated, do a closed water test, so as to ensure the effect of the waterproof layer.

    For the decoration of the bathroom, the most important thing is to do a good job of waterproofing. After all, there is often water in the bathroom, and if the waterproof layer is not done well, then it will affect the residents downstairs and bring trouble to themselves. Therefore, the ground base layer should be cleaned, and then the waterproof layer should be created with paint.

    When creating a waterproof layer, you must pay attention to painting twice, so as to avoid missing places and make the waterproof layer perfect. In addition, after doing a good job of the waterproof layer, you must remember to do a closed water test, so as to ensure the effect of the waterproof layer.

  3. Anonymous users2024-01-22

    It depends on the type of water repellent and the instructions for use.

    Most of the new waterproofing agents can be mixed with cement mortar, or mixed with the powder provided by the product (e.g. JCDecaux) or directly mixed with the net cement by the waterproofing agent (e.g. Lloyal) and then applied to the floor.

    Both have very good water resistance.

    Since these high-quality waterproofing agents are easy to operate, you only need to understand the instructions to guide the workers to implement. If the worker has done it before, there is no problem.

    I hope mine can help you.

  4. Anonymous users2024-01-21

    Hello, after doing a good job of waterproofing, you can use cement mortar to fill in and then tile paving, if you don't want to pave the tile is no problem, don't, do not use pure cement paste on the waterproof layer, pure cement paste thermal expansion and contraction reaction is more obvious, may cause damage to the waterproof layer.

  5. Anonymous users2024-01-20

    The cement mixed with construction glue and cement can be brushed before laying cement mortar, which can prevent layering.

Related questions
3 answers2024-08-30

Depending on what kind of material, generally 24-48 hours after the water test, the construction can be carried out after the water test.

1 answers2024-08-30

You're talking about the nail mouth of the hanging wire when sticking wall tiles, right? There is no need - the nail hole is not large, and the cement can also be plugged. The façade wall is water-seeping, and the small nail holes do not have large melamine!

2 answers2024-08-30

Waterproof does not need to level the ground, waterproof coating is mixed with concrete, but can be brushed to smooth the ground, some with waterproof membrane paving, the top will also cover other materials, the later is still flat, so rest assured, I hope to adopt.

2 answers2024-08-30

Summary. Hello, there is no need to level before waterproofing, and then determine the level and drain after waterproofing. >>>More

6 answers2024-08-30

The bathroom must be waterproof, if the wall of the bathroom is the outer wall of the building, that is, there are no neighbors, then the side wall is also best waterproof to prevent the return of moisture in winter.