What are the waterproofing practices in the bathroom

Updated on Bathroom 2024-08-04
2 answers
  1. Anonymous users2024-01-24

    The toilet space of ordinary residential buildings is narrow, and there are pipelines passing through the floor slab, so the coating is commonly used for waterproofing and the membrane is rarely used for waterproofing.

    There are 2 common types of paint waterproofing:

    Synthetic polymer - polyurethane waterproof coating (polyester cloth, glass fiber cloth, etc. are required for corners, etc.).

    Polymer modified asphalt - SBS waterproof coating (need to add carcass reinforcement materials, polyester cloth, glass fiber cloth, etc.).

    Asphalt-based waterproofing coatings are basically gone.

    Polyurethane waterproof coating is generally practiced as follows:

    1. The ground is oriented to the slope of the floor drain, cement mortar or bean stone concrete, but the surface should be smooth. The slope near the door is small, and the slope near the floor drain is large, so you can grasp it according to the specific situation.

    2. The pipeline passes through the root of the floor slab to strengthen the waterproofing. After the pipe root building sealing paste is sealed tightly, and the cement is smoothed and the foot pads are smoothed, the glass wire cloth reinforcement layer is 1 or 2 layers when brushing the waterproof coating. The same measures are taken near the floor drain.

    3. The wall is clean and flat, without floating ash and small particles, and the small original corner or slope angle is wiped at the junction of the wall and ground. When brushing waterproof coating, paste 1 2 layers of glass wire cloth reinforcement.

    4. The total thickness of the polyurethane waterproof coating film is required to be more than millimeters. It can't be decided by the number of passes. The pipe root and the corner of the reinforcing layer are brushed first, and after the surface is dried at room temperature for 4h, then a large area is brushed and scraped. There shall be no leakage and bubbling. Brush a large area for 24 hours and then apply the next layer after curing.

    6. The waterproof layer on the ground should be painted 300 wide outside the door of the bathroom. The waterproof floor waterproof layer should be 200 meters higher than the ground, and the wall waterproof layer of the bathroom with shower should be 1800 meters higher than the ground (L8 recommends waterproofing the full wall).

  2. Anonymous users2024-01-23

    made their way

Related questions
2 answers2024-08-04

When decorating the bathroom, friends who have experience in decoration will know that the bathroom wall waterproofing is what we must do, because of the particularity of the bathroom, so the bathroom waterproofing is what we must doBathroom walls are waterproofed

1. What are the waterproofing practices for bathroom walls. >>>More

3 answers2024-08-04

The bathroom waterproofing practice is divided into the following five steps, and the steps are as follows: >>>More

5 answers2024-08-04

1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More

2 answers2024-08-04

1.with a water repellent agent. First use waterproofing agent mixed with cement mortar in the kitchen or bathroom to do it again, and then use waterproofing agent mixed with cement ash to brush a layer on the surface in the future, so that the first thing is to plug the small holes that occur after the second drying, and the root of the pipe should be carefully brushed. >>>More

13 answers2024-08-04

1.Choose the right waterproof material: There are many kinds of waterproof materials for the bathroom, such as waterproof coatings, waterproof membranes, waterproof tiles, etc. >>>More