How to install kitchen water and electricity? What to look out for

Updated on Kitchen 2024-08-31
1 answers
  1. Anonymous users2024-01-24

    First, we should pay attention to practicality.

    The second socket should be set up with several more.

    The third socket wire diameter is not less than 4 square meters.

    The fourth empty is more than 25A and has a leakage warranty.

    The height of the fifth socket is meters.

    The height of the fan socket in the sixth row is not less than a meter.

    The seventh socket should avoid water supply and drainage pipes, especially faucets.

    Eighth, pay attention to waterproofing.

    The ninth drainage pipe should be straightened as much as possible to reduce the elbow, and the elbow should be provided with an inspection and cleaning port.

    The tenth is set up with hot and cold water pipes, the faucet is dual-purpose, and the eleventh is reserved for water heater sockets and water supply pipes.

Related questions
1 answers2024-08-31

The following points should be paid attention to in the installation of home decoration waterways: >>>More

2 answers2024-08-31

The first should pay attention to practicability, the second socket should be set up a few more, the third socket wire diameter should not be less than 4 square meters, the fourth empty open more than 25A and with leakage protection, the fifth socket height is meters, the height of the sixth row fan socket is not less than meters, and the seventh socket should avoid water supply and drainage pipes, especially faucets. Eighth, pay attention to waterproofing, the ninth drainage pipe as far as possible to straighten the pipe to reduce the elbow, and set up an inspection and cleaning port at the elbow. The tenth is to set up hot and cold water pipes, the faucet is dual-purpose, and the eleventh is reserved for water heater sockets and water supply pipes.

5 answers2024-08-31

Precautions for kitchen decoration cabinet installation:

One: The infrastructure of the entire space of the kitchen must be completed. Including wall tiles, floor tiles, suspended ceilings; >>>More

1 answers2024-08-31

In fact, the main thing is to see whether the ground cement screed is qualified: the first step should be to pave the uneven ground of the original house with cement mortar, and the kitchen and bathroom should have a slope, and the slope is also very particular. >>>More

2 answers2024-08-31

Hello, 1Check whether the furniture packaging delivered to the home is intact, 2, if you find that the furniture packaging can not enter the customer's home, you must see whether the furniture can be disassembled. In addition, in the distribution of furniture, it is necessary to protect the furniture from bumps, deformations, etc.