How does the kitchen go with water and electricity, what to pay attention to

Updated on Kitchen 2024-08-31
1 answers
  1. Anonymous users2024-01-24

    First of all, the range hood socket is 2 meters 1 from the ground above the stove, and the spare socket is 1 meter 1 high from the ground, and it is done on the top of the console. There is also a look at whether you put a disinfection cabinet in the cabinet, if you want to press a socket in the position of the disinfection cabinet, from the ground.

Related questions
2 answers2024-08-31

Kitchen water and electricity transformation, the first thing is the circuit, planning the placement of electrical appliances, electrical power, and the sum of the working power of electrical appliances to design the square or circuit of wires. >>>More

2 answers2024-08-31

Kitchen hot water problem.

First of all, determine whether our community is to boil hot water or boil it at home, so as to determine whether the supply method of hot water in our home is to use kitchen treasure or use gas stove, or still use electric water heater, etc., so as to determine the direction of the water pipe below. >>>More

1 answers2024-08-31

In fact, the main thing is to see whether the ground cement screed is qualified: the first step should be to pave the uneven ground of the original house with cement mortar, and the kitchen and bathroom should have a slope, and the slope is also very particular. >>>More

1 answers2024-08-31

Hydropower decoration is an important project in our decoration, hydropower decoration is also a hidden project, if there is a problem after the house decoration, it will take a lot of effort to repair, and will cause a lot of inconvenience to home life, we must pay special attention to the hydropower transformation when we carry out the home appliance project, and supervise the workers to construct carefully. So what are the precautions for house decoration, water and electricity? >>>More

2 answers2024-08-31

The kitchen water and electricity installation must first produce a good drawing in the early stage, and at the same time go to the site for on-site positioning to determine the water level, potential position and height of each position, and then carry out the construction. The precautions for hydropower construction are 1, the site must be located, 2, pay attention to the potential and gas as far as possible, 3, pay attention to the height and number of socket positions, 4, the gas stove can not be too close to the refrigerator, 5, the gas water heater as much as possible not to put in the kitchen, 6, the water and electricity must be tested after laying, 7, the kitchen must be put in a special line.