How much does it cost to redo the floor waterproofing treatment if the bathroom is leaking?

Updated on Bathroom 2024-07-29
3 answers
  1. Anonymous users2024-01-24

    It is necessary to remove the existing wall and floor tiles, and then do waterproofing, do a closed water test, and re-lay the wall and floor tiles.

    The cost is materials and labor, and the price we have here is about 2000.

    The construction time is about 10 days, 2 days for demolition, one day for waterproofing, one to two days for drying waterproof coatings, two days for closed water testing, and about two to three days for paving!

  2. Anonymous users2024-01-23

    The bathroom is leaking and needs to be redone for waterproofing.

    To find, the point of the leakage, to deal with it.

    Leaking pipes should be replaced.

    Then thoroughly do a good job of waterproofing, the price can be negotiated with the workers, the amount is too small usually 35 40 yuan per square meter, and the floor tile is about 90 120 yuan per square meter for reference.

  3. Anonymous users2024-01-22

    Generally, the most reliable repair methods for bathroom leakage are: knock off the original floor tiles, pack and pull away the garbage, make a cushion, brush waterproof and plug the leakage, do secondary drainage, backfill, cushion, and then brush the secondary waterproofing, tiling, and tile seams! According to the construction project, the corresponding price can be calculated.

    About 4 square meters of toilet construction price reference:

    1. The cost of dismantling, packing, and garbage removal and removal of the floor tiles in the original bathroom: 1,000 yuan for the general elevator room, and the step room is calculated separately according to the floor height.

    2. Playing cement mortar cushion, paving polypropylene cloth, corner brush plugging king, and then brushing waterproof costs are general: 1200 yuan.

    3. The cost of overhead backfill clay is general: 1,000 yuan or the cost of construction waste backfill: 300 yuan.

    4. The all-inclusive cost of adding secondary drainage to waterway renovation is general: 500 rooms.

    5. The labor cost of ceramic tiles and sand cement is general: 2000 yuan.

    6. The cost of tile sewing is general: 500 yuan.

Related questions
3 answers2024-07-29

The decoration company helps you deal with it better, a phone call, saving a lot of procedures.

2 answers2024-07-29

Indoor polyurethane waterproof coatings are now generally one-component environmentally friendly, and the thickness after brushing is generally required to be thick, and it is not easy to control it if it is brushed several times. In home decoration, if there is a shower in the bathroom, the painting height is, if there is no shower, the painting height is. Price analysis of polyurethane waterproofing per square meter: >>>More

7 answers2024-07-29

The bathroom is waterproof, and the surrounding walls need to be painted at a height of not less than 30 cm; If there is a shower, the height of the waterproof paint applied on the installation of the shower faucet and the adjacent wall should not be less than 150 cm, preferably about 180 cm. >>>More

3 answers2024-07-29

1. The waterproofing of the bathroom generally needs to be brushed 2-3 times. 2. The specific methods are as follows: 1. The ground uses cement mortar to find a slope in the direction of the floor drain, but the surface should be flat. >>>More

5 answers2024-07-29

Water seepage treatment can be carried out with invisible waterproof liquid, and the specific operation steps are as follows: >>>More