Should the hall and dining room be waterproof first?

Updated on Restaurant 2024-07-21
2 answers
  1. Anonymous users2024-01-24

    Now only the toilet will accumulate water, so it is necessary to do waterproofing and water storage test. The kitchen water is all in the sink, and there is no problem of water on the floor, so there is no waterproofing. The closed water test refers to the injection of water for 24 hours before burying the pipes and tiling all the laid water pipes to see if there is any leakage.

    1. Bathrooms and kitchens do not need to be re-waterproofed.

    2. Do waterproofing before paving tiles.

    3. The closed water test is the test after waterproofing.

    4. The closed water test takes 24 hours.

    5. The bathroom should be waterproof on all sides, which is theoretically the case, so that it can be meters, but in practice it is enough to only do 20 cm on the ground. The kitchen floor is not waterproof, and the wall does not need to be waterproofed.

  2. Anonymous users2024-01-23

    In home decoration waterproofing, we generally need to do kitchens, bathrooms, balconies, roofs, basements and if your home is on the ground floor, then all the ground and walls below the wall need to be waterproof and moisture-proof.

    So if your home is not on the ground floor, then the living room and dining room do not need to be waterproofed, and then directly tiled after the base surface is leveled.

Related questions
1 answers2024-07-21

Of course, the balcony is sealed first, because the balcony needs to be expanded screws, and the vibration when the hole is drilled will shake the tiles off.

1 answers2024-07-21

Lay the floor heat first because after laying the floor heat, the water pipe should be sealed with cement, of course, including the water pipe that seals the bathroom floor. >>>More

2 answers2024-07-21

It is good for drainage, and the waterproof construction is done well, and it is okay if you really don't want to do it.

2 answers2024-07-21

Bathroom decoration construction sequence, 1. Change water and electricity. 2. Ground leveling. 3. Do waterproofing, 4. Pave wall tiles, 5. Pave floor tiles. 6. Make a suspended ceiling.

3 answers2024-07-21

It's relatively easy to do it yourself.

First: ground leveling is the uneven place needs to be leveled, so as to save the amount of waterproof mortar and ensure waterproofing. >>>More