Bathroom ceiling waterproofing and water and electricity do that first

Updated on Bathroom 2024-01-27
2 answers
  1. Anonymous users2024-01-23

    Bathroom decoration construction sequence, 1. Change water and electricity. 2. Ground leveling. 3. Do waterproofing, 4. Pave wall tiles, 5. Pave floor tiles. 6. Make a suspended ceiling.

  2. Anonymous users2024-01-22

    Of course, it is to do hydropower first, then to make walls, and finally to make ceilings.

Related questions
8 answers2024-01-27

Yes, there is no rule on which one should be done first.

Before laying wall tiles, be sure to do a good job of waterproof treatment of the wall, in the general bathroom waterproof treatment, the wall should be about 30 cm high waterproof coating, if the wall of the bathroom is a non-load-bearing light wall, the entire wall should be coated with waterproof coating. >>>More

26 answers2024-01-27

It is to put the water first and then level.

The specific process of home decoration bathroom floor: >>>More

4 answers2024-01-27

On the contrary, first do the flooring, and then do the waterproofing. >>>More

5 answers2024-01-27

The supervision of Xiaomi's home decoration reminds you that the waterproof construction of the bathroom must be installed and implemented in the waterproof construction specification to reduce the trouble of water leakage and water seepage in the bathroom in the future. The waterproof height of the toilet can be determined according to the specific needs of the user. >>>More

10 answers2024-01-27

If you're worried about water leakage, the most direct way is to test the water. If there is a water mark on the root of the pipe, it must be that he didn't wrap the pipe for you, or he didn't make it tight. If you want to paint yourself, you can buy some polyurethane, but you don't use much of that, and most of it is sold in barrels. >>>More