How should the waterproofing of kitchens, bathrooms and balconies be accepted

Updated on Kitchen 2024-07-17
1 answers
  1. Anonymous users2024-01-24

    To do a closed water test, first plug the floor drain in the bathroom, store about 10 cm of water, and observe that there is no water leakage downstairs for 24 hours or 48 hours. There is no floor drain in the kitchen and there is no need to do waterproofing, and the balcony does not need to be waterproofed and there is no need to do a closed water test, and the key is the bathroom. Lightning refresh can solve the renovation problem for you.

Related questions
10 answers2024-07-17

1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More

6 answers2024-07-17

1. All are separated by L-shaped passage stones, which is a common situation. >>>More

6 answers2024-07-17

1.The bathrooms have been installed and all the holes to be drilled have been completed. >>>More

3 answers2024-07-17

In my experience, it doesn't matter if you add it or not!

1 answers2024-07-17

The developer has a five-year warranty. Judging by looking at the picture, it can be repaired, and the strong joints should be repaired with cement mortar first, and then brushed again to waterproof.