The best location for the floor drain in the bathroom, is the floor drain in your house installed in

Updated on Bathroom 2024-07-21
1 answers
  1. Anonymous users2024-01-24

    1. Some people think that the floor drain is a sewer pipe, which does not affect the normal use, so of course it is installed under the basin or behind the toilet. But it wasn't until I used it that I realized I was wrong.

    2. If you think that installing it in the middle is more conducive to cleaning, install the floor drain in the most conspicuous middle position of the bathroom, which not only affects the appearance, but also drains a big problem. It is very unfavorable for dry and wet separation, and it is easy to fall.

Related questions
6 answers2024-07-21

The location of the floor drain in the conventional bathroom is reserved in advance according to the design drawings when building the building, unless you are the designer or you can choose the location of the floor drain when building the house yourself.

1 answers2024-07-21

Under the premise that the existing building structure cannot be changed, floor drain odor prevention should be the best way to solve the odor problem. >>>More

3 answers2024-07-21

It can be installed, but there is no need to install a floor drain in a squatting toilet.

10 answers2024-07-21

The floor drain in the bathroom can indirectly affect the comfort of the mood when taking a bath, and it will also have a certain impact on the cleanliness of the bathroom. Therefore, it is best to choose our floor drain below our shower head to prevent the water from flowing too far and affecting other furniture, or if the water will spill out of the door. >>>More

2 answers2024-07-21

If you want to change the location of the floor drain, the key is to see whether the downstairs is decorated, if there is no decoration, you can discuss the bathroom want to leave the position of the floor drain to open up the floor, and then connect to the main sewer, if the downstairs has been decorated, then it is slotted on the ground, where is it needed, and then connected to the position of the original sewer (the key point is to let the floor drain mouth after the change must be higher than the original, there is a certain slope), after the change, you must remember to do a good job of waterproofing, the overall waterproof of the bathroom must be done, and the waterproof is 30 meters high, The wall with a shower is OK.