Whether the overhanging beams are integrated when calculating the quantity of balcony engineering

Updated on Balcony 2024-07-27
3 answers
  1. Anonymous users2024-01-24

    Calculated according to the ribs; When the construction site is suspended, according to the reason for the shutdown, the construction period and the visa for the nest worker (man-machine) will be carried out; According to the site conditions, if the site is narrow, and the stacking point to the construction lifting point needs to be transported twice, the cost can be calculated according to the direct cost or according to the actual mechanical labor visa.

  2. Anonymous users2024-01-23

    The balcony calculates the engineering quantity according to the projection area, which already includes the balcony beams; If it is caused by the owner, you can calculate the cost of lost time, the rent of machinery and equipment, etc., and the construction period will be extended, but these must have a visa.

  3. Anonymous users2024-01-22

    The calculation of the quantity of the balcony is calculated according to its horizontal projection area, and the balcony beams have been included. The reason for the shutdown of the construction site depends on who is responsible, and there are many costs that need to be calculated, which should be analyzed on a case-by-case basis. The second reverse is just a project name, with a specific specified distance, but to calculate this fee, a visa is generally required, and it is calculated according to the visa.

Related questions
5 answers2024-07-27

It's a pity that I didn't study civil engineering, I studied mechatronics engineering, and I can also pay attention to it: >>>More

3 answers2024-07-27

Calculated by the extension meter! The arc shape is calculated as the arc length, and the special-shaped is counted.

1 answers2024-07-27

Balconies are calculated according to the horizontal projection area, and the amount of concrete of the balcony: the balcony is calculated according to the horizontal projection area protruding from the external wall. The amount of formwork for the balcony: >>>More

3 answers2024-07-27

The drawing is written below that the plate thickness is not indicated as 110, if the bathroom and balcony are not indicated in situ, then the bathroom and balcony plate thickness is 110, and the bathroom and balcony are 50 lower than the floor, which means that the bottom of the bathroom and balcony is 50 lower than the bottom of the floor, so that although the plate thickness is 110, the effect of the bathroom and balcony is 50 lower than the floor. But if you take a closer look, the thickness of the bathroom board should be thinner.

3 answers2024-07-27

Theoretically, it should be deducted, but in practice, the place where the squatting pit is reserved, the floor tiles are to be cut in an arc, which increases the workload, and the collage is more complicated than other places, so generally for the convenience of calculation, the area is not deducted. It doesn't cost much money to process, and it is calculated evenly, after all, it occupies a small area.