Wall, column, beam, railing, canopy, canopy, what is the plastering order of the ceiling

Updated on Suspended ceilings 2024-07-27
1 answers
  1. Anonymous users2024-01-24

    Plastering order: The exterior wall plastering should be the upper part first, then the lower part, first the cornice and then the wall. Wipe the façade first, then the top surface, then the bottom surface.

Related questions
1 answers2024-07-27

Generally speaking, quotas are for large-scale projects. Minor works are based on the price of local materials plus the actual cost of renovation man-hours, plus management fees, taxes and profit fees, which add up to your quota.

2 answers2024-07-27

The anti-water ground beam is also called the water-stopping concrete beam!

4 answers2024-07-27

The height of the bottom surface of the false beam can be made to the same height as the lower edge of the yin corner line of the integrated ceiling, so that the façade without false beams in the kitchen does not need to be tiled; The wallpaper on the wall can also be pasted to the corner line of the integrated ceiling; It is concise and trouble-free, and the sense of space transparency is also strong. >>>More