The construction of the waterproof layer of the bathroom should be done on the bottom floor or after

Updated on Bathroom 2024-07-10
3 answers
  1. Anonymous users2024-01-24

    If the requirements are high, you can do two layers, the bottom layer is better, and then one layer is done after filling, which is the best.

  2. Anonymous users2024-01-23

    Fill it and do it again, and do a 24-hour closed water test after doing it to make sure that there is no leakage and then do the finishing layer.

  3. Anonymous users2024-01-22

    Do it after wiping the leveling layer, and then inlay the tiles after the water is closed.

Related questions
6 answers2024-07-10

1.The bathrooms have been installed and all the holes to be drilled have been completed. >>>More

5 answers2024-07-10

Decoration must not only care about the shape, the good-looking skin is very simple, and the quality of construction is the last word, such as the waterproofing of the bathroom, the top priority. >>>More

6 answers2024-07-10

1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More

10 answers2024-07-10

1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More

1 answers2024-07-10

If you plan for the long term, it's best to redo it so that it's more waterproof.