  1. Anonymous users2024-01-24

    Yes, it is recommended to lay tiles first, and then drill holes for installation.

  2. Anonymous users2024-01-23

    Install the handrails properly after laying the bricks first.

Related questions
7 answers2024-07-28

Of course, the floor drain is installed first, and try to choose a good quality anti-odor floor drain.

9 answers2024-07-28

For bathroom decoration, the first to lay the floor tiles or the first to lay the wall tiles, which needs to be decided by the residents according to the specific situation of the home decoration bathroom, mainly whether the paving of floor tiles or wall tiles is conducive to the previous construction of the project for reasonable protection, so as not to cause damage to the construction projects installed before, such as circuits, waterways, etc. >>>More

4 answers2024-07-28

The bathroom must be tiled first and then installed with a toilet. . . >>>More

11 answers2024-07-28

First wall tiles and floor tiles.

But a kind suggestion: the water pipe must be protected by a brick clamp. >>>More

1 answers2024-07-28

Bathroom, kitchen: bathroom and tile are two more serious water vapor space, we need to paste wall tiles and floor tiles first, these important foundation works after the completion of the ceiling, otherwise the joints are not properly handled, the later stage is also very troublesome, but also will affect the overall visual enjoyment.