Should the building electrical engineering be separated from the ceiling in the hidden inspection wa

Updated on Suspended ceilings 2024-07-12
2 answers
  1. Anonymous users2024-01-24

    It must be separated, the reason is (example piping): 1. The concealment time of the piping in the wall and the piping in the ceiling is different; 2. The piping practices are different; 3. The inspection content of concealed engineering is different. It is better to separate, otherwise the construction process will not intersect.

  2. Anonymous users2024-01-23

    It can be inspected together and carried out as a hidden piping engineering inspection batch!

Related questions
3 answers2024-07-12

The grounding wire in the socket is connected to the grounding busbar in the distribution box. >>>More

2 answers2024-07-12

According to the Ministry of Housing and Urban-Rural Development of the People's Republic of China issued the "Code for the Calculation of Building Surface of Construction Projects", regardless of whether the balcony is closed or open, concave balcony or picky balcony, it will be included in the construction area according to 1 2 of the balcony projection area.

1 answers2024-07-12

Is there any specific provision for the balcony of the building in the Code for the Calculation of the Floor Area of Construction Projects?GB/T 50353-2013 >>>More

4 answers2024-07-12

Brother, it's good to get used to it.

This is the reason why many developers find that the area exceeds the standard after reporting the planned area. >>>More

1 answers2024-07-12

Recommended TENGEN series, TENGEN building, TENGEN water supply and drainage, TENGEN electric are available.