Water or electricity in the bathroom at home

Updated on Bathroom 2024-07-05
2 answers
  1. Anonymous users2024-01-24

    Hydropower is done in one piece, because the water pipes and wire sleeves are buried in the wall.

  2. Anonymous users2024-01-23

    Renovation?

    Hydropower is all designed and done together.

    It can be done at the same time.

Related questions
2 answers2024-07-05

As long as there is a backfill pit in the bathroom, it is necessary to do waterproofing in the backfill pit first, and then do a closed water test, and then backfill and leveling the ground and wall to do waterproofing and then do a closed water test, and then tiling!

2 answers2024-07-05

Do waterproofing first. Then lay the floor tiles.

4 answers2024-07-05

Hello, I'm glad to answer for you, in the bathroom, it is tiled first, and then the heating is installed, because the bricks are attached to the wall, and there is no effect on the installation of heating. This is also acceptable to ordinary people.

4 answers2024-07-05

According to the specification, it should be prefabricated in the floor base layer of the water barrier, and then waterproof construction, the waterproof layer needs to be turned over the water barrier, and then the water barrier is installed on the water barrier, and finally the bricks are paved, so as to ensure that the water in the shower area will not seep out. >>>More

2 answers2024-07-05

See if there is a beam on the top surface of your kitchen and bathroom, the bottom of the beam is pasted to the beam, and the beam height is pasted to about a meter. If you use 300*450 wall tiles and paste 5 and a half pieces, it will be almost the same with the waistline.