How to lay the solid wood floor on the ground

Updated on Solid wood 2024-07-29
2 answers
  1. Anonymous users2024-01-24

    There are four main ways to install solid wood flooring, in addition to this, it is also necessary to pay attention to the inspection work before and after the installation of solid wood flooring. Here's how to do it:

    1) Keel pavement method: that is, the wooden keel and plastic steel keel pavement method, which needs to be made of wooden keel.

    2) Suspension pavement method: that is, the use of moisture-proof film or moisture-proof mat to install, this method is currently more popular.

    3) Direct pasting method, that is, environmentally friendly floor adhesive paving method.

    4) Wool floor mat method.

    This is the main installation method of solid wood flooring, and different installation methods require different tools and materials.

    1) Before the floor is installed, the solid wood floor is in place, and the installer needs to first check the number of floors and accessories with the customer, and check whether there is any damage, and ask the customer to sign for confirmation. Then, check the amount of flooring, the flatness of the floor, the use of auxiliary materials, etc., and wait until everything is confirmed to be correct before installing.

    2) After installation, we must pay attention to acceptance, mainly that the surface of the solid wood floor should be clean, no burrs, grooves, no defects in the corners, full paint surface, no paint leakage, and firm laying.

    When installing, the key is to find a good master, as the saying goes: three points of flooring, seven points of installation. That's it.

  2. Anonymous users2024-01-23

    1.The basic requirements of the ground.

    Check the flatness of the ground with a ruler of 2m, the flatness should be less than or equal to 3mm 2mm, if it exceeds the standard requirements, it should be leveled, otherwise the floor will make a noise after installation. The moisture content of the ground should be less than 20. All concealment works in the room must be accepted, and the ceiling and lamps in the room should be installed.

    2 Preparation before installation.

    After the ground acceptance meets the requirements, the ground should be cleaned. The surface of the geothermal floor is usually heck, and there are many sand particles wrapped in cement, if not treated, these sand particles will cause the moisture-proof film to break under the floor, resulting in moisture-proof failure, discoloration and warping of the parquet, and causing the laminate floor to bulge. If you find sand particles wrapped in cement, you can scrape the old floor head with the ground to dispose of the sand particles and clean them again.

    3. Laying of moisture-proof film.

    The floor slab contains a lot of water, and there will be a lot of water overflow when the ground is heated, and it is very important to do a good job of moisture-proof during the floor installation process, and many complaints are related to the lack of moisture-proof. Usually, the installation process is just to lay a layer of moisture-proof mat under the floor, and the connection of the moisture-proof mat is also tightly sealed with tape. However, when the local heat temperature is high, the tape will degum after being heated, and the connection of the sealing moisture-proof pad will be breathable, resulting in moisture-proof failure.

    Therefore, a layer of plastic film (about thickness) should be laid on the ground, and the joints should be overlapped by 200mm, and sealed tightly with tape, which can have a good moisture-proof effect. The plastic film returns to the same height as the corner line at the edge of the wall, which can protect the corner line, and also ensure that the edge of the floor is not damp and avoid the edge of the floor. Lay another layer of floor mat on top of the plastic film (the thickness of the floor mat is about 2mm).

    This has both a moisture-proof effect and a cushioning effect. If you already have a silent mat behind the floor, it is best to just lay a layer of plastic film (otherwise the mat is too thick and will affect the heat conduction). Install geothermal flooring on top of the floor mats.

    4 Installation of the floor.

    Geothermal flooring should be installed and accepted in strict accordance with the relevant requirements in the code for the pavement, acceptance and use of wooden floors (GB T 20238-2006).

Related questions
2 answers2024-07-29

There are two ways to pave: first, hit the wooden keel on the ground, and then brush the glue on it to paste the wooden floor. The advantage is that it is not easy to regain moisture, and the disadvantage is that walking on it will make a knocking sound. >>>More

4 answers2024-07-29

It must be leveled, otherwise there will be a sound after it is paved.

9 answers2024-07-29

The keel is firm and the ground is level.

The uneven ground will make part of the floor and keel hang, so that when you walk in the future, the floor is easy to make noise. The same situation is prone to occur if the ground keel is not firmly laid, so be sure to check it after the wooden keel is laid. You can step on the wooden keel with both feet, and check whether the ground keel is firm by shaking your feet, and if you don't work enough, you need to reinforce. >>>More

1 answers2024-07-29

You can use Bilev self-leveling cement to level the ground, the construction is simple, environmentally friendly, the construction period is short, the cost is low, the construction method is one, the ground is cleaned first, no oil, no stagnant water, no loose mortar, two, roller coating interface agent 1-2 third, and so after the interface agent is dry, and then the construction of self-leveling cement, the amount of water of self-leveling cement should be added in accordance with the amount of water indicated in the package, the need to measure the bucket or electronic scale, the main tools required for construction, mixer, self-leveling cement scraper, defoaming roller, spikes. The material cost is about 10 yuan per square meter.

10 answers2024-07-29

It will affect the service life of the solid wood floor.

Consumers will think that the uneven ground should be found to sell wood flooring to help level, in order to sell many wood flooring merchants can only compromise, in fact, solid wood floor sellers work. >>>More