Decoration hardcover kitchen, bathroom brick masonry, water pipe well, 2005003000 labor hours

Updated on Kitchen 2024-07-09
2 answers
  1. Anonymous users2024-01-24

    Hardcover rooms are generally all included, so there is no need to pay for additional working hours.

  2. Anonymous users2024-01-23

    When choosing cabinets, you should also pay attention to the length of the warranty period, Opai cabinets, Boloni, Simi cabinets and other top brand cabinets have a long warranty period, so you don't have to worry about after-sales problems.

Related questions
1 answers2024-07-09

Perforated bricks are counted as 240 * 115 * 90, and the ash joint is generally 1cm, so that 1 (block But you also need to consider the loss of mortar, you need how much mortar you want according to a brick, in multiplying 320 on the line.

6 answers2024-07-09

The situation you said exists, the hidden pipe does look beautiful and neat, but there is a problem of inconvenient maintenance, so when choosing the water pipe material, you must not be careless, you must choose a good water pipe, which will reduce a lot of trouble in the future, so the connection part of the water pipe must be repeatedly pressurized and tested before the wall, to avoid repeated disassembly and assembly. If you choose high-quality water pipe materials, those that pass the test can generally be used for many years.

1 answers2024-07-09

It should be possible, but at a certain height above the ground, such as 250mm, it is better not to use aerated bricks, and do other things.

2 answers2024-07-09

The renovation of water and electricity in the bathroom renovation is particularly important and needs to be started as early as possible, because it will involve the heating of the bath bomb, the line direction of the light, the wall of the water pipe, etc., so it is necessary to develop a detailed water and electricity design before the transformation, so as to improve the safety quality and meet the needs of the decoration owners. It is best for the owners to make it more convenient to repair and maintain in the future when the bathroom is renovated with water and electricity, and then do a good job of concealing it.

4 answers2024-07-09

The developer sells the finely decorated house, the warranty period of the bathroom tile paving is two years, and the tile cracks fall off within two years are the responsibility of the developer, and the developer should provide free warranty. As for the owner's loss of work and other expenses caused by the repair, it should be settled according to the facts, of course, the two parties can also negotiate to compensate for the cost, and the owner will repair it himself.