The living room floor was punched a hole by the developer to transport materials

Updated on Living room 2024-07-03
1 answers
  1. Anonymous users2024-01-24

    Although concrete also has the effect of water insulation, it is not a waterproof material in the strict sense, and it will leak without making holes when water accumulates. If you want to waterproof, you have to lay waterproof material on concrete. If the concrete is poured well after the hole, the water insulation effect is similar to that when the hole is not made.

    If you don't make up it well, if you don't do it in the right way or if you don't take it seriously, you will almost certainly miss it.

    The better method of filling the hole is generally: 1. Clean the loose concrete around the hole; 2. Sweep away the scum and ash around the hole; 3. Rinse the concrete surface around the hole with water, and support the formwork; 4. First pave 1:2 cement mortar 30 50 mm wide along the concrete around the hole; 5. Immediately after laying mortar, pour fine stone concrete with a strength grade higher than the original concrete, and vibrate carefully when pouring, neither under-seismic nor over-seized; 6. After watering, it is necessary to carefully spray water for 7 days, and the strength should not be shaken before reaching 70.

    If the original has been mended and the repair is not ideal, you can remove 50 width and 40 50 mm groove between the new and old concrete around the hole, clean, sweep, rinse, thoroughly dry and fill the waterproof cement or other waterproof materials, and smooth the surface with mortar. Generally speaking, it can achieve the water insulation effect when the original hole is not drilled.

Related questions
2 answers2024-07-03

This problem is indeed difficult to define, if it is a waterproof problem, according to the requirements of relevant laws and regulations, the bathroom waterproof posture is 5 years, that is to say, you can find the construction unit for water leakage within five years, but it is still necessary to see if the upstairs decoration process has destroyed the original waterproofing. If it is not a waterproof problem, it is a crack in the floor slab, it is a structural problem, the structural warranty period is the design life, the general residence is 50 years, if the construction unit does not care, you can complain to the quality department of the construction committee where the house is located, and provide relevant pictures and video data to prove the documents, and the construction committee will talk to the construction unit to deal with it. This question depends on the situation, I hope it can help you!

1 answers2024-07-03

The buyer has an invoice, and the invoice price is added up to the compensation price.

1 answers2024-07-03

The heating fee is charged according to the floor area of the house, and it has nothing to do with how the balcony is used.

3 answers2024-07-03

According to the resettlement compensation agreement and the drawings at the time, the demolition party can be sued for damages. >>>More

1 answers2024-07-03

The balcony is an exclusive part of the ownership of the owner's building and is protected by law.