What should I do if I buy a commercial house and forget to install a floor drain in the developer s

Updated on Bathroom 2024-07-23
3 answers
  1. Anonymous users2024-01-24

    See if you have this problem in the same type of house upstairs and downstairs as you, and then check other problems in the house, list the common problems, and negotiate with the developer to solve them.

  2. Anonymous users2024-01-23

    It should not be in compliance with national standards, and in combination with several common developers to solve these problems. It is better to look at the original drawings, the flaws in the design or why.

  3. Anonymous users2024-01-22

    Let the developer fix it.

Related questions
3 answers2024-07-23

If you prosecute, you can't get it.

It is possible to unite a part of the owners and claim compensation. >>>More

5 answers2024-07-23

Definitely not! Because the bathroom and kitchen were originally designed, the pipe diameter of the sewer was different, the sewer pipe diameter of the bathroom was generally 110mm, and the pipe diameter of the kitchen sewer was generally 50mm. Think for yourself, can your stool be flushed away in a 50mm pipe? >>>More

5 answers2024-07-23

If the design documents of the building pass the review of the fire management agency, and the construction of the building is carried out in accordance with the design documents and passes the acceptance, it shall be qualified. No unit or individual may make changes without the approval and consent of the professional management department or institution. It is wrong for individual owners to change the entrance door from inward to outward without the approval and consent of the fire management agency, which affects the evacuation function of the fire escape. >>>More

4 answers2024-07-23

The floor drain reserved by the developer is generally the most ordinary, and its anti-odor performance and firmness are relatively ordinary, and it is recommended to replace it in the later decoration.

7 answers2024-07-23

When the bathroom is connected, the developer has done waterproofing, and at this time, you can do a closed water test to verify that there is no problem with waterproofing before taking over the room. But after receiving the room, you need to decorate, in the decoration will be the bathroom water and electricity transformation, and then the waterproof layer of the bathroom has basically been destroyed, so it is recommended that it needs to be re-waterproofed, otherwise it is easy to leak over time. >>>More