In the renovation of the house, when does the waterproofing of the bathroom start?

Updated on Bathroom 2024-07-24
4 answers
  1. Anonymous users2024-01-24

    Home improvement bathroom waterproofing in you lay out the pipes, water and electricity after the leveling is done again, and so the leveling layer is dry after the waterproof construction, do the waterproofing, and wait for the waterproof to dry for more than 24 hours to do the closed water test for more than 20 hours to confirm that the waterproof acceptance is qualified, the waterproof protective layer is paved in the tile Thank you,

  2. Anonymous users2024-01-23

    Do waterproofing before sticking the floor tiles.

  3. Anonymous users2024-01-22

    After doing the base layer, start to do waterproofing. Generally, when making the waterproof layer, everyone neglects a problem, that is, the base layer of the waterproof layer; I think that as long as I buy the materials, I can do it, but in fact, it is not; The base layer is not good, and no matter how good the material is, it cannot be guaranteed to be waterproof; Therefore, the base layer is not good or bad, which plays a very important role in waterproofing; The requirements for the grassroots are that there is no sand, no cracks, smoothness, and no hollowing; Different materials have different requirements for the humidity of the substrate; If the ground is slotted, the buried pipe can be repaired before the waterproof layer can be made.

  4. Anonymous users2024-01-21

    There are two kinds of waterproofing, the blue wall is rigid waterproof, which will penetrate into the wall after painting, and the hardness is high, which can prevent the tiles from falling down; The green ground is flexible and waterproof, forming a soft film after brushing, with great elasticity, and the ground is not easy to leak after painting.

Related questions
1 answers2024-07-24

Bathroom due to the frequent use of water (toilet, bathtub, shower room or washing machine, etc.) the ground or wall often has water, if not waterproof, even if the tiles are paved, there will be water through the tile gaps, once the ground is soaked in water, it is easy to cause water to penetrate downstairs through the floor slab, or through the partition wall to the next door, causing the loss of other people's homes will be very troublesome, and even cause economic losses. Therefore, when decorating, the bathroom must be waterproof. >>>More

4 answers2024-07-24

Sorry, I can't provide this information.

The bathroom in the northwest corner may have a certain impact on the health of family members, but it can be resolved in some ways. >>>More

2 answers2024-07-24

After the bathroom is changed to water and electricity and floor drain, it should be waterproof, not only the ground, but also the wall from the ground around it should be 200mm high, and the wall in the shower should be 1500mm high, and the floor tiles can be paved after waterproofing.

9 answers2024-07-24

It is necessary to install a shower room in the bathroom, which can keep the room clean and hygienic as a whole, separate dry and wet, and also play a role in keeping warm in winter. >>>More

3 answers2024-07-24

Watertight; Waterproof must not be leaked, other functional facilities such as bathing, sinks, toilets, etc. are routine, but also pay attention to the switch socket should be waterproof, lamp with anti-fog.