What to do with opening a 200400 hole in the bathroom floor and cutting off two slab reinforcements

Updated on Bathroom 2024-06-30
4 answers
  1. Anonymous users2024-01-24

    The treatment method of opening a 200*400 hole in the bathroom floor and cutting off two slab reinforcements:

    Add steel bars at the opening of the slab, generally with a model of steel bars you match, but it is recommended to increase the number one, add one on each side of the hole, if the distance from the adjacent steel bar is larger, add 2. See Atlas 11G101-1, page 102.

    If it has been poured in the opening of the hole, it is really troublesome, only to ensure that the hole is not subject to the imposed load and vibration, and the reinforcement does not play much role. When plugging, the concrete or mortar mark is heightened and blocked, as long as the slab is not large, the usual attention is made.

  2. Anonymous users2024-01-23

    Add steel bars at the opening of the slab, generally with a model of steel bars you match, but it is recommended to increase the number one, add one on each side of the hole, if the distance from the adjacent steel bar is larger, add 2.

    See Atlas 11G101-1, page 102.

    If it has been poured in the opening of the hole, it is really troublesome, you can only ensure that the hole is not subject to the imposed load and vibration, and the reinforcement will not play much role. When you plug it, adjust the concrete or mortar mark to the height of the blocking, as long as the bay where your board is not big, usually pay attention to the point. 。

  3. Anonymous users2024-01-22

    The code stipulates that more than 300 holes are equipped with stiffeners, the short direction is fine, the long direction is more than 100, theoretically it should be strengthened, in practice there is nothing to do, as long as the hole is not subject to vibration and strong load, it is fine. Reinforcement also does not play a role.

  4. Anonymous users2024-01-21

    The current situation is not easy to deal with, and the private parts are opened, so the only way to reduce the load is to try to reduce the load.

Related questions
1 answers2024-06-30

The sound of floor tiles or hard materials in your home or your neighbor's house. The reason is that there are no expansion joints, and the climate change in winter causes thermal expansion and cold contraction.

1 answers2024-06-30

The waterproof sealing effect of the bathroom floor slab is relatively good, and the key to dealing with the problem of water leakage is to accurately find out the leakage point. The leakage point mostly occurs in the upper and lower water pipes, the junction of the floor drain and the floor slab, clean it up after finding the leakage point (the cleaning range is larger than the leakage range) and make it dry, and seal it with sealant. It is better to work from the floor slab, or from the roof if it is not convenient. >>>More

1 answers2024-06-30

This one is waterproof.

Or do it waterproof on the outside. >>>More

2 answers2024-06-30

Generally, double-layer two-way configuration reinforcement is used.

7 answers2024-06-30

The floor slab of the bathroom is leaking, first you need to determine the cause of the leak: >>>More