Is the floor waterproofing and wall waterproofing of the kitchen brushed separately?

Updated on Kitchen 2024-06-20
1 answers
  1. Anonymous users2024-01-24

    1. It is recommended not to separate the brush, because the connection between the ground and the wall is easy to leak, and the plumbing and sanitary ware and yin and yang corners should also be strengthened, and the waterproof needs to be closed for 24-72 hours to check whether there is water leakage.

    There is no problem with the closed water test, and it proves that the waterproof is qualified.

Related questions
5 answers2024-06-20

It's best to do it all at once, and if you do it separately, you need to have enough overlapping layers.

6 answers2024-06-20

Waterproof coating is not suitable for wall waterproofing, because after the waterproof coating is done, it has to be made of a layer of concrete protective layer. The protective layer is thin and easy to crack and peel off. It is thick and takes up space, and it costs man-hours and hours. Use. >>>More

1 answers2024-06-20

To do bathroom waterproofing, you should first do wall waterproofing, and then do ground waterproofing, so as to prevent the ground waterproofing from being damaged when doing wall waterproofing again. >>>More

1 answers2024-06-20

Generally speaking, if there is a floor drain, the wall height is more than 30CM, and if there is no floor drain, it can not be waterproofed.

1 answers2024-06-20

Yes, when doing waterproofing, the wall façade must be waterproof with a height of tens of centimeters.