Glodon 2008 balcony how to do

Updated on Balcony 2024-06-25
2 answers
  1. Anonymous users2024-01-24

    Other linear components, such as "custom lines" in "Custom".

  2. Anonymous users2024-01-23

    You're referring to the calculations in the software, right? 1.The bay window is only arranged with bay window panels, and the periphery is surrounded by a virtual wall (do not enter the thickness when the virtual wall is established, the thickness has no practical meaning and affects the intuitiveness of the layer) to form a closed structure, and the name of the room inside is the bay window, and its number is counted separately;

    2.Balcony corner window, if you are from the steel bar upside down, then in the steel bar to merge the corner wall of the balcony, and then arrange the corner window, the software itself can turn the layout, pour to the figure will automatically break into 2, automatic division is very regular; If I draw the figure directly, then I only know to separate two windows and put them together

    3.Also, don't pay attention to the original The existence of the software is for the accuracy of the calculation, and the effect of the three-dimensional display is secondary Establish the corner window into 2 windows that can be arranged, and find a suitable place on the balcony to arrange it Don't ask for so much 4It is recommended to go to the Q&A search inside the Glodon service Shinkansen.

Related questions
2 answers2024-06-25

Glodon graphic calculation GCL2008 stairs, balconies and other composite components are calculated according to the building consumption quota calculation rule version. The specific rights are as follows: >>>More

1 answers2024-06-25

The ground clearance drawings of the window sill have instructions and requirements, and the construction can be done according to the drawings.

1 answers2024-06-25

It is more convenient to use custom lines in the software for this section of reinforcement. >>>More

1 answers2024-06-25

You can not draw. You don't have to draw everything, it's faster to calculate it by hand.

3 answers2024-06-25

1. Since the waterproof layer is not exposed on the surface, when doing waterproofing, you must first find the previous waterproof layer. >>>More