What are the construction procedures and procedures of bathroom plumbing appliances?

Updated on Bathroom 2024-06-30
1 answers
  1. Anonymous users2024-01-24

    Slotted first--- put the tube --- pressure test--- put it on hold temporarily. Tile the walls and floors by a bricklayer.

    Paste the wall and floor tiles. Then install the bathroom.

Related questions
1 answers2024-06-30

When the base surface is uneven, it needs to be repaired. Yin and yang corner areas, bends and other uneven needs to be leveled, as well as the removal of parts should be repaired and smoothed first, if there are cracks and seepage parts of the base, appropriate plugging methods should be used to repair first. >>>More

4 answers2024-06-30

The main first step in the toilet construction process is to do a good job of waterproofing. Then the wall is trenched, the water lines and electrical wiring are routed. Then it's time to put tiles. Paste the wall tiles first, then the floor tiles. That's it for the basic process.

3 answers2024-06-30

Change water and electricity, do waterproofing, test whether the water is leaking, wrap columns, paste wall tiles, paste floor tiles, install integrated top-mounted switches and sockets, basins, toilets, showers, partitions, towel racks.

3 answers2024-06-30

Generally, waterproofing is done before tiling or applying putty. Bathrooms and kitchens are waterproof first, and then do other processes, so that the waterproof effect is good. >>>More

1 answers2024-06-30

There are three design options:

The first generation design water trap is installed under the ceiling downstairs and is surface-mounted; >>>More