    The main first step in the toilet construction process is to do a good job of waterproofing. Then the wall is trenched, the water lines and electrical wiring are routed. Then it's time to put tiles. Paste the wall tiles first, then the floor tiles. That's it for the basic process.

  2. Anonymous users2024-01-22

    Make the water and electricity in the bathroom first.

    After doing a good job, it is to pave the colored floor, generally speaking, it is to pave tiles.

    Finally, install bathing equipment, such as a bath, etc.

  3. Anonymous users2024-01-21

    Toilet floor construction process: structural level cleaning, cement mortar slope layer, cleaning slope layer surface, detail additional layer construction, coating film waterproof layer, water test experiment, dry hard cement mortar bonding layer, plain cement surface paving tiles.

  4. Anonymous users2024-01-20

    Plumbing wiring.

    Waterproof floor tiles, wall tiles.

    Bathroom door. Toilet, bathroom cabinet, towel rail, small back cage.

Related questions
1 answers2024-04-24

When the base surface is uneven, it needs to be repaired. Yin and yang corner areas, bends and other uneven needs to be leveled, as well as the removal of parts should be repaired and smoothed first, if there are cracks and seepage parts of the base, appropriate plugging methods should be used to repair first. >>>More

2 answers2024-04-24

The process sequence is to do the edge level first, then hit the expansion bolt and boom, install the edge line, then hang the light steel main keel, then hang the auxiliary keel of the plate, and finally install the plate, and you can do it.

2 answers2024-04-24

Go to the website of Weifang Zhengda Waterproof Material Company, there is a detailed introduction to various materials, as well as how to use it.

3 answers2024-04-24

What are the precautions for bathroom decoration: Bathroom decoration precautions 1: The design threshold of the threshold is to prevent water from overflowing from the bathroom >>>More

1 answers2024-04-24

I saw a lot of construction plans for various projects in the Levan Construction Service Network, you go there to find out if there are any of these plans you want, and I look for construction plans when I look for them.